Difference between revisions of "Shift How-To"

From Hall A Wiki
Jump to: navigation, search
(Magnets)
(Systems)
Line 25: Line 25:
  
 
= Systems =
 
= Systems =
 +
 +
== Alarms ==
  
 
== Beam Line ==
 
== Beam Line ==

Revision as of 11:29, 9 June 2021

Overview

This page gives instructions for various aspects of the experiment relating to each of the major subsystems and shift tasks.

Shift Roles

  • Shift Leader: Executes the Run Plan according to the Run Coordinator's instructions
  • Target Operator: Monitors the target system
  • Data Quality Monitor: Starts and stops CODA DAQ runs and monitors the quality of the data that is being recorded

Reporting and Logging

Taking Data

  • Using the CODA DAQ
    • GUI Description
    • Starting a Run
    • Stopping a Run
  • Monitoring the data
  • Online analysis
  • Shift checklist

Recovery Procedures

Systems

Alarms

Beam Line

Target

Magnets

  • BigBite
  • Super BigBite
  • Corrector Magnets
  • LHRS

Detectors

BigBite

  • GEMs
  • GRINCH
  • Timing Hodoscope
  • Preshower and Shower

Super BigBite

  • GEMs
  • HCAL