Difference between revisions of "Halls A and C Spectrometer Support Group Whiteboard"

From Hall A Wiki
Jump to: navigation, search
Line 6: Line 6:
  
 
Heaters for HMS magnet flags
 
Heaters for HMS magnet flags
 
Replace the Lakeshore 450 gaussmeter for HMS Q1
 
  
 
Help Brad re-configure the DAQ rack in Counting Room C - May 17-21
 
Help Brad re-configure the DAQ rack in Counting Room C - May 17-21

Revision as of 19:26, 28 June 2021

Remove three Oxford power supplies from HMS

HMS Q2 lead voltage drops

Heaters for SHMS magnet flags

Heaters for HMS magnet flags

Help Brad re-configure the DAQ rack in Counting Room C - May 17-21

Controls for SBS corrector coils

Re-tap the SBS supply main transformer for full power

re-install ground fault detector in LQ1 supply - requires configuration of module

connect power and LCW to BB supply on R-arm platform

re-locate displays for hacweb11 and 14

clean up R-arm supply platform

clean up L-arm supply platform

Install new liquid level meters on SHMS

Remove actuators from right arm magnets

HMS supply control boxes into the Shield Hut

Gas mix controller for GEM detectors

Fix relay box for HMS counting room E-Stops