Difference between revisions of "September 24th 2021"
From Hall A Wiki
(Created page with "*Updates **HCal **Bigbite Shower **Hodoscope **CDet **LHRS **GEM Bigbite INFN *** **GEM Bigbite UVA **GEn RP chamber **Helicity **Beamline/scalers *On going tasks **Cable to...") |
|||
Line 1: | Line 1: | ||
*Updates | *Updates | ||
**HCal | **HCal | ||
+ | ***issue between TI, one bad transceiver in one HCAL TI, replaced and working in stand alone | ||
+ | ***fixed prescales ( bug in readout list ) - now working | ||
+ | ***cosmics calibration on-going | ||
+ | ***combined run - replayed run - timing need to be adjusted for TI - can look at it today now TS is working | ||
+ | ***load slot error | ||
+ | ***Bryan managed to convert script in systemd, now threshold are restored when crate is power cycled ( running ) | ||
+ | ***EDTM pulser work : mostly installed but need to be tested. | ||
+ | ***Ellen set up Raspberry pi , given the PVs , can look at the values and make a GUI, want to add as check to shift checklist | ||
**Bigbite Shower | **Bigbite Shower | ||
+ | ***taking data, Provokar focusing on calibration and optimizing HV | ||
+ | ***Mark changed TDC to available 1190 in hodo instead of F1 | ||
+ | ***data looks ok for shower, preshower might need adjustement | ||
**Hodoscope | **Hodoscope | ||
+ | ***calibration using cosmics run, might need to tweak a few channel | ||
+ | ***calibrating NINO threshold : want to start with 1.6 V threshold | ||
+ | ***d | ||
+ | **GRINCH | ||
+ | ***FADC in the crate and cabled | ||
+ | ***readout being worked | ||
+ | ***will look | ||
+ | ***need to find a better trigger with LED for more efficient data taking | ||
+ | ***NINO threshold set back to 1.5 V | ||
**CDet | **CDet | ||
**LHRS | **LHRS | ||
+ | ***measured latency 1.08 us, will adjust and take data | ||
+ | ***will implement Fastbus | ||
+ | ***will plug L1A into scaler | ||
+ | ***prescale GUI for TS | ||
+ | ***start and end of run scripts, EPICS and scaler working | ||
+ | ***deadtime monitor, need L1A in scaler | ||
+ | ***will implement with full config | ||
**GEM Bigbite INFN | **GEM Bigbite INFN | ||
− | *** | + | *** things are going well overall, just one chamber needing work |
− | ** | + | *** all modules took data and seems to work |
+ | *** working on enabling FIR | ||
+ | **UVA clean room | ||
+ | ***almost finished cabling | ||
+ | ***waiting for VTP | ||
**GEn RP chamber | **GEn RP chamber | ||
**Helicity | **Helicity | ||
+ | ***waiting for opportunity to test the helicity in sbs account | ||
+ | ***will go on sbsvme29 eventually, can do basic testing on sbsvme29 until signals are fed there | ||
**Beamline/scalers | **Beamline/scalers | ||
− | + | ***set up patch panel BNC to LEMO to go SBS DAQ | |
+ | ***will work with Heidi start pulling cable | ||
+ | ***will use the L shape cable tray : slight modification | ||
+ | ***will start laying cables Friday afternoon | ||
+ | ***might need one more bundle | ||
+ | ***patch panel : will need to plug into helicity scaler | ||
+ | ***need to fan out BCM cable in DAQ bunker - add logic fan | ||
+ | ***need to copy helicty signal | ||
*On going tasks | *On going tasks | ||
− | **Cable to weldment ( | + | **Cable to weldment ( David / Heidi by mid week of Monday 27th ) |
**cabling scaler/beamline crate ( David , Bob 50%) | **cabling scaler/beamline crate ( David , Bob 50%) | ||
− | **HRS to TS and timing ( Bob, Maria | + | **HRS to TS and timing ( Bob, Maria 50% ) |
− | **EPICS / start End of run logging script (Alex, Bob) - need ER for insertion - | + | **EPICS / start End of run logging script (Alex, Bob 50%) - need ER for insertion - |
− | **script check MPD sync ( Ben , Andrew ) - is new firmware ready ? check with Ben | + | **script check MPD sync ( Ben , Andrew ) - is new firmware ready ? check with Ben : code to unpack information already written - need run with those data - timestamp need some work |
− | **RF (Alex, Bob ) - located RF prescaler and signal - need to send to HRS and SBS weldment - need add F1 for RF - can put in FADC avalaible ? | + | **RF (Alex, Bob ) - located RF prescaler and signal - need to send to HRS and SBS weldment - need add F1 for RF - can put in FADC avalaible ? |
**sync check scripts ( Andrew , Alex ) | **sync check scripts ( Andrew , Alex ) | ||
− | **EDTM at least 1 Hz for helicity | + | **EDTM at least 1 Hz for helicity ( Scott, Arun, Mark ? ) Just need to check it is working : look for 10 Hz EDTM - need to put in TDC too |
− | **Hodoscope v1190 clock ( Alex , Mark , Ralph) | + | **Hodoscope v1190 clock ( Alex , Mark , Ralph) - still need to be checked - corrupted data when installed |
***check if calibration is needed after switch | ***check if calibration is needed after switch | ||
− | **Full configration all crates ( Alex, Bryan ) - can attach process to components | + | **Full configration all crates ( Alex, Bryan ) - can attach process to components - just finish CODA config |
− | **need setup screens for online display and analysis, Hall A tools on big screen - can make a map file | + | **need setup screens for online display and analysis, Hall A tools on big screen - can make a map file - |
**data rate test with new computer and 3 VTPs ( Alex, Bryan ) - | **data rate test with new computer and 3 VTPs ( Alex, Bryan ) - | ||
**test GEM zero supression ( Sean, Holly )- done | **test GEM zero supression ( Sean, Holly )- done | ||
Line 36: | Line 76: | ||
**suggest taking all detectors cosmics every night - took a few runs ! | **suggest taking all detectors cosmics every night - took a few runs ! | ||
**add scaler crate to full config ( Alex, Steve ) | **add scaler crate to full config ( Alex, Steve ) | ||
− | **coincidence trigger (done | + | **coincidence trigger (done ) - need fine tune inputs at TS |
− | + | **BB CAL and HCAL at TS - delayed after coincidence (Mark, done ) - need the RC box for FADC ref channel - need delay single triggers - add GRINCH LED - | |
− | **BB CAL and HCAL at TS - delayed after coincidence (Mark, done ) | + | |
**reference channel to all crates - need HCal and Shower + RF | **reference channel to all crates - need HCal and Shower + RF | ||
**Final CODA config (Bryan, Alex) | **Final CODA config (Bryan, Alex) | ||
**add FADCs for shower sum and HODO ( Mark, David ?) | **add FADCs for shower sum and HODO ( Mark, David ?) | ||
− | **add FADCs for GRINCH (Bryan/Alex) | + | **add FADCs for GRINCH (Bryan/Alex) - need read out configured - token passing and config file - |
− | **read threshold for discriminator from with RPi be Ellen, need give code to Steve | + | **read threshold for discriminator from with RPi be Ellen, need give code to Steve - could add in logentry or wiki for adding in other scripts |
− | **scaler gating with TS (Alex) | + | **scaler gating with TS (Alex) , need include code in readout list - Steve looking at adding to TS list |
− | + | **MPD crates on hareboot6 - can be power cycled remotely | |
+ | ** put UVA GEM LV on reboot switch | ||
*Issues | *Issues | ||
+ | **transceiver issues | ||
+ | ***might need to replace | ||
+ | ***reset issue possible | ||
+ | *** 1 out of 4 HRS run with TS, if reboot TS usually fixes it | ||
**network issue : one short fiber replaced, will try to put in protective tube | **network issue : one short fiber replaced, will try to put in protective tube | ||
**LHRS TI : working now | **LHRS TI : working now | ||
− | **GEM with TS hanging - | + | **GEM with TS hanging - real MPD out of sync - fixed with new firmware |
**Shower FADC bad channel - FADC replaced but problem could not be reproduce - need to test more | **Shower FADC bad channel - FADC replaced but problem could not be reproduce - need to test more | ||
− | **HCAL FADC bad channel | + | **HCAL FADC bad channel - repaired by Bill - jumper wiggled loose - if no pedestal - could be this jumper |
**HCAL ROC16 fiber - will double check if fiber 5 enabled - use slave5 - added additionnal fiber for ROC16 - | **HCAL ROC16 fiber - will double check if fiber 5 enabled - use slave5 - added additionnal fiber for ROC16 - | ||
− | **warning PEB ROC - Bryan checking with Dave - might incorrect flag - not sure why - but data still in sync since only happens | + | **warning PEB ROC - Bryan checking with Dave - might incorrect flag - not sure why - but data still in sync since only happens - might be the data corruption from FAN IO - might be fixed now - also had |
− | **Shower F1 issue at high rate - need to check with OT#2 - check at sync event implemented - DMA error might come from multiple pulsing - switched to 1190 | + | **Shower F1 issue at high rate - need to check with OT#2 - check at sync event implemented - DMA error might come from multiple pulsing - switched to 1190 - |
**Helicity scaler readout : issues working with same DMA configuration - scalers doing regular VME | **Helicity scaler readout : issues working with same DMA configuration - scalers doing regular VME | ||
− | **need copy of L1A for helicity scaler | + | **need copy of L1A for helicity scaler - can send TI output ? will look at L1A TS output - might |
**Full config still hanging on LHRS and HCAL busy | **Full config still hanging on LHRS and HCAL busy | ||
− | **GEM firmware | + | **GEM firmware - now GEM should be ok - buffering should - shower and GEM |
− | + | ||
*use HV EPICS : type go_hv on aslow on adaqsc , need people to check if it works and if mapping is correct | *use HV EPICS : type go_hv on aslow on adaqsc , need people to check if it works and if mapping is correct | ||
+ | **control system studio try self update and NFS down | ||
+ | **EPICS server need to be started at boot, Ole and Bryan | ||
+ | **can put documentation for other control | ||
+ | |||
+ | *Helicity board : 2 avalaible | ||
+ | *F1 : need to test high rate | ||
+ | |||
+ | *could increase threshold - window width 1000 ns maybe - need to be optimized - 40 ns - no remote threshold right now - on camac - might be able to control | ||
+ | 288 channels = 18 NIM modules |
Latest revision as of 11:37, 24 September 2021
- Updates
- HCal
- issue between TI, one bad transceiver in one HCAL TI, replaced and working in stand alone
- fixed prescales ( bug in readout list ) - now working
- cosmics calibration on-going
- combined run - replayed run - timing need to be adjusted for TI - can look at it today now TS is working
- load slot error
- Bryan managed to convert script in systemd, now threshold are restored when crate is power cycled ( running )
- EDTM pulser work : mostly installed but need to be tested.
- Ellen set up Raspberry pi , given the PVs , can look at the values and make a GUI, want to add as check to shift checklist
- Bigbite Shower
- taking data, Provokar focusing on calibration and optimizing HV
- Mark changed TDC to available 1190 in hodo instead of F1
- data looks ok for shower, preshower might need adjustement
- Hodoscope
- calibration using cosmics run, might need to tweak a few channel
- calibrating NINO threshold : want to start with 1.6 V threshold
- d
- GRINCH
- FADC in the crate and cabled
- readout being worked
- will look
- need to find a better trigger with LED for more efficient data taking
- NINO threshold set back to 1.5 V
- CDet
- LHRS
- measured latency 1.08 us, will adjust and take data
- will implement Fastbus
- will plug L1A into scaler
- prescale GUI for TS
- start and end of run scripts, EPICS and scaler working
- deadtime monitor, need L1A in scaler
- will implement with full config
- GEM Bigbite INFN
- things are going well overall, just one chamber needing work
- all modules took data and seems to work
- working on enabling FIR
- UVA clean room
- almost finished cabling
- waiting for VTP
- GEn RP chamber
- Helicity
- waiting for opportunity to test the helicity in sbs account
- will go on sbsvme29 eventually, can do basic testing on sbsvme29 until signals are fed there
- Beamline/scalers
- set up patch panel BNC to LEMO to go SBS DAQ
- will work with Heidi start pulling cable
- will use the L shape cable tray : slight modification
- will start laying cables Friday afternoon
- might need one more bundle
- patch panel : will need to plug into helicity scaler
- need to fan out BCM cable in DAQ bunker - add logic fan
- need to copy helicty signal
- HCal
- On going tasks
- Cable to weldment ( David / Heidi by mid week of Monday 27th )
- cabling scaler/beamline crate ( David , Bob 50%)
- HRS to TS and timing ( Bob, Maria 50% )
- EPICS / start End of run logging script (Alex, Bob 50%) - need ER for insertion -
- script check MPD sync ( Ben , Andrew ) - is new firmware ready ? check with Ben : code to unpack information already written - need run with those data - timestamp need some work
- RF (Alex, Bob ) - located RF prescaler and signal - need to send to HRS and SBS weldment - need add F1 for RF - can put in FADC avalaible ?
- sync check scripts ( Andrew , Alex )
- EDTM at least 1 Hz for helicity ( Scott, Arun, Mark ? ) Just need to check it is working : look for 10 Hz EDTM - need to put in TDC too
- Hodoscope v1190 clock ( Alex , Mark , Ralph) - still need to be checked - corrupted data when installed
- check if calibration is needed after switch
- Full configration all crates ( Alex, Bryan ) - can attach process to components - just finish CODA config
- need setup screens for online display and analysis, Hall A tools on big screen - can make a map file -
- data rate test with new computer and 3 VTPs ( Alex, Bryan ) -
- test GEM zero supression ( Sean, Holly )- done
- GEM cosmics ( Sean, Holly )
- Shower cosmics (Arun, Provokar )
- HCAL cosmics (Scott)
- GRINCH cosmics ( Bradley )
- Hodoscope cosmics ( Ralph )
- DAQ documentation ( Alex, Rachel ,Don)
- suggest taking all detectors cosmics every night - took a few runs !
- add scaler crate to full config ( Alex, Steve )
- coincidence trigger (done ) - need fine tune inputs at TS
- BB CAL and HCAL at TS - delayed after coincidence (Mark, done ) - need the RC box for FADC ref channel - need delay single triggers - add GRINCH LED -
- reference channel to all crates - need HCal and Shower + RF
- Final CODA config (Bryan, Alex)
- add FADCs for shower sum and HODO ( Mark, David ?)
- add FADCs for GRINCH (Bryan/Alex) - need read out configured - token passing and config file -
- read threshold for discriminator from with RPi be Ellen, need give code to Steve - could add in logentry or wiki for adding in other scripts
- scaler gating with TS (Alex) , need include code in readout list - Steve looking at adding to TS list
- MPD crates on hareboot6 - can be power cycled remotely
- put UVA GEM LV on reboot switch
- Issues
- transceiver issues
- might need to replace
- reset issue possible
- 1 out of 4 HRS run with TS, if reboot TS usually fixes it
- network issue : one short fiber replaced, will try to put in protective tube
- LHRS TI : working now
- GEM with TS hanging - real MPD out of sync - fixed with new firmware
- Shower FADC bad channel - FADC replaced but problem could not be reproduce - need to test more
- HCAL FADC bad channel - repaired by Bill - jumper wiggled loose - if no pedestal - could be this jumper
- HCAL ROC16 fiber - will double check if fiber 5 enabled - use slave5 - added additionnal fiber for ROC16 -
- warning PEB ROC - Bryan checking with Dave - might incorrect flag - not sure why - but data still in sync since only happens - might be the data corruption from FAN IO - might be fixed now - also had
- Shower F1 issue at high rate - need to check with OT#2 - check at sync event implemented - DMA error might come from multiple pulsing - switched to 1190 -
- Helicity scaler readout : issues working with same DMA configuration - scalers doing regular VME
- need copy of L1A for helicity scaler - can send TI output ? will look at L1A TS output - might
- Full config still hanging on LHRS and HCAL busy
- GEM firmware - now GEM should be ok - buffering should - shower and GEM
- transceiver issues
- use HV EPICS : type go_hv on aslow on adaqsc , need people to check if it works and if mapping is correct
- control system studio try self update and NFS down
- EPICS server need to be started at boot, Ole and Bryan
- can put documentation for other control
- Helicity board : 2 avalaible
- F1 : need to test high rate
- could increase threshold - window width 1000 ns maybe - need to be optimized - 40 ns - no remote threshold right now - on camac - might be able to control
288 channels = 18 NIM modules