Difference between revisions of "February 25th 2022"
From Hall A Wiki
Line 4: | Line 4: | ||
**ET/EPICS insertion : scaler / EPICS | **ET/EPICS insertion : scaler / EPICS | ||
**timestamp from prestart | **timestamp from prestart | ||
− | **analyzer support for multiple streams | + | **ET insertion : First event implementation |
+ | **analyzer support for multiple streams : handling stream, and database and look on different disks | ||
**High rate testing : BB VTP + BB GEM VTP | **High rate testing : BB VTP + BB GEM VTP | ||
+ | **Helicity : setting up so helicity information is recorded in all streams, tell to ROL how many streams | ||
+ | **need to check with software to handle several streams ( or at worse make a file with all events ) - need some thinking | ||
+ | |||
*Tasks for next run | *Tasks for next run | ||
+ | **SBS GEM bunker fiber and network install | ||
**VETROC in HCAL crate and split with F1 | **VETROC in HCAL crate and split with F1 | ||
**HCAL digital trigger | **HCAL digital trigger | ||
**Bigbite ECal digital trigger | **Bigbite ECal digital trigger | ||
− | ** | + | **FADC VTP readout status ? Current firmware as only number of FADC that can stream through VTP - can stream 16 FADC to VTP - HCAL FADC and FADC firmware - need work - could implement FADC readout directly first - and work on HCAL trigger after |
− | **HV rpi : adapt with newer Rpi and network boot and/or mount files system and prepare SD | + | |
+ | **HV rpi : adapt with newer Rpi and network boot and/or mount files system and prepare SD - Rpi1 vs new Rpi 2 3 ? Mode to talk to pins, need some adapt | ||
+ | |||
+ | *GEM latency improvement | ||
+ | **Latency for each APV |
Latest revision as of 12:06, 25 February 2022
- Updates
- Running with several event builders
- ET/EPICS insertion : scaler / EPICS
- timestamp from prestart
- ET insertion : First event implementation
- analyzer support for multiple streams : handling stream, and database and look on different disks
- High rate testing : BB VTP + BB GEM VTP
- Helicity : setting up so helicity information is recorded in all streams, tell to ROL how many streams
- need to check with software to handle several streams ( or at worse make a file with all events ) - need some thinking
- Tasks for next run
- SBS GEM bunker fiber and network install
- VETROC in HCAL crate and split with F1
- HCAL digital trigger
- Bigbite ECal digital trigger
- FADC VTP readout status ? Current firmware as only number of FADC that can stream through VTP - can stream 16 FADC to VTP - HCAL FADC and FADC firmware - need work - could implement FADC readout directly first - and work on HCAL trigger after
- HV rpi : adapt with newer Rpi and network boot and/or mount files system and prepare SD - Rpi1 vs new Rpi 2 3 ? Mode to talk to pins, need some adapt
- GEM latency improvement
- Latency for each APV