Install VVU on SBB power supply - VVU is by the supply
+
Install VVU on SBB power supply - VVU is by the supply (Joe)
 
+
Install spring washers on SBB and BB busbars and connections
+
  
 
Readout for LCW pressure sensors added at end of beamline walkway (not started)
 
Readout for LCW pressure sensors added at end of beamline walkway (not started)
 
Fix LCW leak in LD1 Dynapower
 
 
Replace pressure sensors on the Hall A Ethane manifold - PR for sensors to be submitted in January
 
  
 
Check if optocoupler is missing in LQ2 FuG - Looked for this. Didn't see one on the main boards, but realized as I am writing this, maybe it was for the interface for remote polarity switching? --Ellen
 
Check if optocoupler is missing in LQ2 FuG - Looked for this. Didn't see one on the main boards, but realized as I am writing this, maybe it was for the interface for remote polarity switching? --Ellen
Line 15: Line 9:
 
Buy and replace MFCs in old FPP mixing system - MFCs on order
 
Buy and replace MFCs in old FPP mixing system - MFCs on order
  
Replace ground fault module in LQ1 power supply - on 2nd floor of CH
+
Replace air compressor in Hall A Gas Shed - asked for quote
 
+
Replace air compressor in Hall A Gas Shed
+
 
+
Find video cables from hall in the CH
+
  
 
Gas manifolds for GEM gas cylinders (started)
 
Gas manifolds for GEM gas cylinders (started)
  
 
Hall C Moller: setup new chiller, modify bertha, get new helium lines installed when they come in and test magnet cooldown
 
Hall C Moller: setup new chiller, modify bertha, get new helium lines installed when they come in and test magnet cooldown
 
  
 
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)
 
Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)
Line 31: Line 20:
  
 
Determine 100% liquid level set point/Hall C magnets.
 
Determine 100% liquid level set point/Hall C magnets.
 
Build better "shield hut" for SHMS lead flow controllers.
 
  
 
Warm up HB.
 
Warm up HB.
  
Add "T's" and pump out ports to HMS magnet vacuum gage ports.
+
Add "T's" and pump out ports to HMS magnet vacuum gauge ports.
  
 
Add ventilation to SHMS Dipole flow meter shielding.
 
Add ventilation to SHMS Dipole flow meter shielding.
Line 66: Line 53:
 
== Do We Still Need To Do These? ==
 
== Do We Still Need To Do These? ==
  
Test LQ2 FuG with new polarity reversal switch.
+
== Possible Future Items ==
  
Mount Left Shield House temperature readout in CH
+
Remote reset for Hall C spectrometer motion (maybe next year)
  
Find and connect NMR cables in CH
+
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).
  
Swap out MFCs in VDC mixing system
+
Fix LCW leak in LD1 Dynapower
  
== Possible Future Items ==
+
Replace pressure sensors on the Hall A Ethane manifold
  
Remote reset for Hall C spectrometer motion (maybe next year)
+
Replace ground fault module in LQ1 power supply
  
Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).
+
Test LQ2 FuG with new polarity reversal switch.
 +
 
 +
Swap out MFCs in VDC mixing system

Revision as of 10:20, 17 March 2022

Priority Items

Install VVU on SBB power supply - VVU is by the supply (Joe)

Readout for LCW pressure sensors added at end of beamline walkway (not started)

Check if optocoupler is missing in LQ2 FuG - Looked for this. Didn't see one on the main boards, but realized as I am writing this, maybe it was for the interface for remote polarity switching? --Ellen

Buy and replace MFCs in old FPP mixing system - MFCs on order

Replace air compressor in Hall A Gas Shed - asked for quote

Gas manifolds for GEM gas cylinders (started)

Hall C Moller: setup new chiller, modify bertha, get new helium lines installed when they come in and test magnet cooldown

Nitrogen supply for GEM gas cylinder valves (Clippard valves and cylinder controller) (not started)

Gas mix controller and MFCs for GEM detectors (not started)

Determine 100% liquid level set point/Hall C magnets.

Warm up HB.

Add "T's" and pump out ports to HMS magnet vacuum gauge ports.

Add ventilation to SHMS Dipole flow meter shielding.

Find 4 atmos leak in Hall C.

Move ozone meters from VME to PI.

Add fan to beamline side lead (HB)

Modify HMS lead heaters, add perforated sheets up stream and add a perforated box downstream to fit heater.

Move equipment back to UPS power

Would Be Good To Do Items

Remove actuators from right arm magnets. (Dipole/Q3 complete)

clean up R-arm supply platform

clean up L-arm supply platform

HMS/SHMS Heater and fan changes, fixes, upgrades etc.

Calibrate and op-check spare warm return valves for Hall C.

Add bypass switch for SHMS UPS - Switch ordered

Do We Still Need To Do These?

Possible Future Items

Remote reset for Hall C spectrometer motion (maybe next year)

Install new liquid level meters on SHMS- Install done, waiting on software and LN2 probe cal to go live (need Steven).

Fix LCW leak in LD1 Dynapower

Replace pressure sensors on the Hall A Ethane manifold

Replace ground fault module in LQ1 power supply

Test LQ2 FuG with new polarity reversal switch.

Swap out MFCs in VDC mixing system