Difference between revisions of "Pol He-3 Target Information GEn"

From Hall A Wiki
Jump to: navigation, search
(Expert Information)
(Expert Information)
Line 14: Line 14:
 
* [[Backout Checklist after Target Work inside Enclosure ]] REVIEW THIS PAGE
 
* [[Backout Checklist after Target Work inside Enclosure ]] REVIEW THIS PAGE
  
== Expert Information ==
+
== Expert Instructions ==
 
=== Target Cell ===
 
=== Target Cell ===
  

Revision as of 07:06, 14 October 2022

Experiment Information

Target Operator Instructions

  • PolHe3 Target Training Slides [1]
  • PNMR Training slides
  • How to bring up relevant target GUIs
  • Polarized He3 Target Operational Restrictions (raster, beam current limits, etc)
  • Procedure for Moving Between Target Cells
  • Reference Cell Fill Procedure

Checklists

Expert Instructions

Target Cell

Reference Cell

Cooling Jet Alignment

Pol He3 Field Mapping Data

Pol He3 Field Map from TOSCA simulation

Circular Raster Information

Reboot Switches

Reset Target Ladder Motion Control

Cable/RTD/Signal Maps

Fiber RTD hardware trip points

PolHe3 Alarm Handler defaults

Reference Cell Information

Production Target Cell Information

PolHe3 Polarization Citation/Reference Link

Final Cell polarizations and supporting documentation is (will be) on the Hall C DocDB
  https://hallcweb.jlab.org/doc-private/ShowDocument?docid=1182
Use that URL as a citation/reference in papers.

Additional Details

Nominal Cell Status summary slide 
  • Any cells that are production ready need to be flagged as such
  • Any cells that have seen beam should be flagged with the date range
  • Production cell target chamber wall thickness measurement location (JLab Measurements)

File:Production Cell Wall Thickness.png

  • Production cell target chamber wall thickness measurement location (UVa Measurements)

600px

Currently Installed Cell

Cells Being Readied for Installation

Older Installed Cells

Addition Documentation

Additional Documentation

Target CAD Files/Photos

Manuals