Difference between revisions of "Pol He-3 Target Information GEn"
From Hall A Wiki
(→Reference Cell Information) |
(→Production Target Cell Information) |
||
Line 42: | Line 42: | ||
== Production Target Cell Information == | == Production Target Cell Information == | ||
− | === | + | === General Specifications for Target Cells === |
− | + | documents from Gordon? | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
=== Currently Installed Cell === | === Currently Installed Cell === | ||
− | *; | + | *; Hunter |
− | ** | + | ** Installed in target: 10/14/2022 |
− | + | ||
− | + | ||
=== Cells Being Readied for Installation === | === Cells Being Readied for Installation === | ||
− | |||
− | |||
− | |||
− | *; | + | *; Pristine |
− | ** | + | ** Undergoing tests at UVA |
− | ** | + | |
+ | *; Windmill | ||
+ | ** Undergoing tests at UVA | ||
=== Older Installed Cells === | === Older Installed Cells === | ||
− | *; | + | *; Ukraine |
− | ** Installed in target: | + | ** Installed in target: 10/06/2022 to 10/13/2022 CHECK THIS BEGINNING DATE |
+ | ** Used for commissioning | ||
** Characterization Document: [[Media:Production_Cell_Info_-_Cell_Austin.pdf]] | ** Characterization Document: [[Media:Production_Cell_Info_-_Cell_Austin.pdf]] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
=== Addition Documentation === | === Addition Documentation === | ||
− | + | information on study of magnetic field alignment in cells? | |
− | + | ||
− | + | ||
− | + | ||
== Additional Documentation == | == Additional Documentation == |
Revision as of 07:12, 14 October 2022
Contents
- 1 Experiment Information
- 2 Target Operator Instructions
- 3 Checklists
- 4 Expert Instructions
- 5 Reference Cell Information
- 6 Production Target Cell Information
- 7 Additional Documentation
- 8 Manuals
Experiment Information
Target Operator Instructions
- PolHe3 Target Training Slides [1]
- PNMR Training slides
- How to bring up relevant target GUIs
- Polarized He3 Target Operational Restrictions (raster, beam current limits, etc)
- Procedure for Moving Between Target Cells
- Reference Cell Fill Procedure
Checklists
- Checklist before starting Target Work inside the Enclosure REVIEW THIS PAGE
- Backout Checklist after Hall Access for Target Work REVIEW THIS PAGE
- Backout Checklist after Target Work inside Enclosure REVIEW THIS PAGE
Expert Instructions
Target Cell
Reference Cell
Cooling Jet Alignment
Pol He3 Field Mapping Data
Pol He3 Field Map from TOSCA simulation
Circular Raster Information
Reboot Switches
Reset Target Ladder Motion Control
Cable/RTD/Signal Maps
Fiber RTD hardware trip points
PolHe3 Alarm Handler defaults
Reference Cell Information
- Documents from Todd?
Production Target Cell Information
General Specifications for Target Cells
documents from Gordon?
Currently Installed Cell
- Hunter
- Installed in target: 10/14/2022
Cells Being Readied for Installation
- Pristine
- Undergoing tests at UVA
- Windmill
- Undergoing tests at UVA
Older Installed Cells
- Ukraine
- Installed in target: 10/06/2022 to 10/13/2022 CHECK THIS BEGINNING DATE
- Used for commissioning
- Characterization Document: Media:Production_Cell_Info_-_Cell_Austin.pdf
Addition Documentation
information on study of magnetic field alignment in cells?
Additional Documentation
Target CAD Files/Photos
- Document Control Group
- Use 'Advanced Search Options': Category='hall c', Document number='67507'
- Selected Target Shop Drawings
- Target Ladder
- Carbon Foil Mount Plate
- 7 foils spaced 2.625" (6.667 cm) apart
- Upstream entrance window should be at z=-30.0cm (based off 67507-00017-1.pdf, 67507-00014.pdf, 67507-00024-1.pdf)
- Target Oven
- Platform and coils
- Carbon Foils
- Photos of Target Setup (google drive link)
- CAD Models from Bert
- JT files