Difference between revisions of "Pol He-3 Target Information GEn"

From Hall A Wiki
Jump to: navigation, search
(Older Installed Cells)
(Additional Documentation)
Line 67: Line 67:
  
 
== Additional Documentation ==
 
== Additional Documentation ==
* [https://hallcweb.jlab.org/wiki/index.php/kepco Info on Kepco Power Supplies]
 
* [https://hallaweb.jlab.org/wiki/index.php/Target_Lab_Main EEL Target Lab Main Page]
 
* [https://hallaweb.jlab.org/wiki/index.php/Hall_A_He3_Polarized_Target 2008/9 Hall A Pol 3He Target Page]
 
  
 
=== Target CAD Files/Photos ===
 
=== Target CAD Files/Photos ===
Line 76: Line 73:
  
 
* Selected Target Shop Drawings
 
* Selected Target Shop Drawings
** [[Media:67507-00047.pdf|Target Ladder]]
 
** [[Media:A060100304-1101.pdf|Carbon Foil Mount Plate]]
 
*** ''7 foils spaced 2.625" (6.667 cm) apart''
 
*** ''Upstream entrance window should be at z=-30.0cm''  (based off 67507-00017-1.pdf, 67507-00014.pdf, 67507-00024-1.pdf)
 
** [[Media:67507-00051.pdf|Target Oven]]
 
** [[Media:67507-00080-1.pdf|Platform and coils]]
 
** [[Media:67507-00087-1.pdf|Carbon Foils]]
 
 
* [https://drive.google.com/drive/folders/1Fgofz97IFzQ7719Az3cl8vAUy3tfbaQZ?usp=sharing Photos of Target Setup] (google drive link)
 
* [https://userweb.jlab.org/~metzger/HALL%20C%20A1N%20D2N%20UPDATED%20DRAWINGS/ CAD Models from Bert]
 
* [https://drive.google.com/drive/folders/19NzT8S-xV6y6AcHtqN6FyNPesMLzz0wy?usp=sharing JT files]
 
  
 
== Manuals ==
 
== Manuals ==

Revision as of 07:18, 14 October 2022

Experiment Information

Target Operator Instructions

  • PolHe3 Target Training Slides [1]
  • PNMR Training slides
  • How to bring up relevant target GUIs
  • Polarized He3 Target Operational Restrictions (raster, beam current limits, etc)
  • Procedure for Moving Between Target Cells
  • Reference Cell Fill Procedure

Checklists

Expert Instructions

Target Cell

Reference Cell

Cooling Jet Alignment

Pol He3 Field Mapping Data

Pol He3 Field Map from TOSCA simulation

Circular Raster Information

Reboot Switches

Reset Target Ladder Motion Control

Cable/RTD/Signal Maps

Fiber RTD hardware trip points

PolHe3 Alarm Handler defaults

Reference Cell Information

  • Documents from Todd?

Production Target Cell Information

General Specifications for Target Cells

documents from Gordon?

Currently Installed Cell

  • Hunter
    • Installed in target: 10/14/2022

Cells Being Readied for Installation

  • Pristine
    • Undergoing tests at UVA
  • Windmill
    • Undergoing tests at UVA

Older Installed Cells

  • Ukraine
    • Installed in target: 10/06/2022 to 10/13/2022 CHECK THIS BEGINNING DATE
    • Used for commissioning
    • Characterization Document:

Addition Documentation

information on study of magnetic field alignment in cells?

Additional Documentation

Target CAD Files/Photos

  • Selected Target Shop Drawings

Manuals