Difference between revisions of "Checklist for each shift"
From Hall A Wiki
Line 4: | Line 4: | ||
# Take a screenshot of the target screens 2-3 times. | # Take a screenshot of the target screens 2-3 times. | ||
− | |||
# Take an NMR measurement every 2 hours and record the results. [https://hallaweb.jlab.org/wiki/index.php/Measurements] | # Take an NMR measurement every 2 hours and record the results. [https://hallaweb.jlab.org/wiki/index.php/Measurements] | ||
# Confirm that the target is in the correct position and that if you have to move it, you do so correctly. [https://hallaweb.jlab.org/wiki/index.php/Procedure_for_Moving_Between_Target_Cells] | # Confirm that the target is in the correct position and that if you have to move it, you do so correctly. [https://hallaweb.jlab.org/wiki/index.php/Procedure_for_Moving_Between_Target_Cells] | ||
# Confirm that the holding field settings are correct, and change these settings if the magnet configuration is changed. [https://hallaweb.jlab.org/wiki/index.php/Helmholtz_Coils_Settings_for_Different_Magnet_Configurations] | # Confirm that the holding field settings are correct, and change these settings if the magnet configuration is changed. [https://hallaweb.jlab.org/wiki/index.php/Helmholtz_Coils_Settings_for_Different_Magnet_Configurations] |
Revision as of 07:50, 15 October 2022
<< Back
Here is a list of things that the TO should do each shift. There may be other tasks needed to be done for shifts in which we are doing something other than taking production data. The RC and/or SL will let the TO what else they need to do.
- Take a screenshot of the target screens 2-3 times.
- Take an NMR measurement every 2 hours and record the results. [1]
- Confirm that the target is in the correct position and that if you have to move it, you do so correctly. [2]
- Confirm that the holding field settings are correct, and change these settings if the magnet configuration is changed. [3]