Difference between revisions of "ERR"

From Hall A Wiki
Jump to: navigation, search
(Agenda)
(More details on Content of the talks)
Line 72: Line 72:
 
=='''More details on Content of the talks'''==
 
=='''More details on Content of the talks'''==
 
{| style="width: 90%;"
 
{| style="width: 90%;"
 
+
|-
 +
| 8:00    ||    ''Closed Session''      ||(15)                ||           
 +
|-
 +
| 8:15  ||      Remarks from Chair and Charge      ||            Chair  (5)
 
|-  
 
|-  
| 8:30   ||    '''Charge item 1''': Concept of GEp/SBS experiment, close to PAC update     ||        BogdanW  
+
| 8:20   ||    '''Charge item 1''': The status of the equipment required for this experiment ([https://hallaweb.jlab.org/wiki/images/6/6c/GEp-ERR_overview.pdf '''pdf'''])     ||        BogdanW (10+5)
 +
|-
 +
| 8:35  ||    '''Charge Items 1c, 2b, and 6''': Proton Polarimeter; ... analyzing power; The simulation and data analysis software status for the experiment (['''pdf'''])      ||    Andrew Puckett (20+20) 
 +
|-
 +
| 9:15  ||    '''Charge Items 1b, 2a''': GEMs and associated electronics; GEM reconstruction efficiency at high rate (['''pdf''']).                          ||  Holly Szumila-Vance  (20+20)   
 +
|-
 +
| 9:55  ||    '''Charge Item 3''': The responsibilities, manpower and other resources  (['''pdf'''])                                                      ||    Mark Jones (10+10)     
 
|-
 
|-
| 8:50   ||    '''Charge Items 1b, 2a''': SBS GEM tracker  and electronics. Observed efficiency at high luminosity                                                  ||   Nilanga Liyanage, Holly Szumila-Vance   
+
|10:15   ||    '''Break'''   ||       (10)
 
|-
 
|-
| 9:20   ||    '''Charge Items 1c, 2b, and 5''': One analyzer polarimeter. Analyzing power; The simulation and data analysis software status    ||     Andrew Puckett 
+
|10:25   ||    '''Charge Item 4''': The entire beamline, spectrometers, detector configuration been defined, including ownership, maintenance and control during beam operations ([https://hallaweb.jlab.org/wiki/images/7/79/ERR_-_SBS_GEp_Installation.pdf '''pdf'''])                                                                                              ||     Jessie Butler (15+15)       
 
|-
 
|-
| 9:50   ||    '''Charge Item 3''': The responsibilities, manpower and other resources                                                      ||     Mark Jones   
+
|10:55   ||    '''Charge Item 1''': Design report including modifications to beamline, SBS and detectors ([https://hallaweb.jlab.org/wiki/index.php/File:GEn_ERR.pptx '''ppt'''])                                        ||       Robin Wines (15+15)
 
|-
 
|-
|10:30   ||     '''Charge Item 4''': The entire beamline, spectrometers, detector configuration been defined, including ownership, maintenance and control during beam operations    ||   Jessie Butler         
+
|11:25   ||   '''Charge Item 1a''': Target and scattering chamber configuration (['''pdf'''])      || S. Covrig Dusa (10+10)
 
|-
 
|-
|11:00  ||     '''Charge Item 1''': Design report including modifications to beamline, SBS and detectors                      ||       Robin Wines 
+
|11:45      ||   '''Lunch''' || (60)
 
|-
 
|-
|11:30  ||    '''Charge Item 1a''': Target and scattering chamber configuration                                                                || S. Covrig Dusa 
+
|'''Afternoon''' || '''Session'''
 
|-
 
|-
|13:00   ||    '''Charge Item 1d''': ECAL calorimeter           ||  Donald Jones      
+
|12:45   ||    '''Charge Item 1d''': ECAL calorimeter ([https://hallaweb.jlab.org/wiki/index.php/File:GEp_ECAL.pptx '''ppt'''])  ||  Donald Jones (20+20)     
 
|-
 
|-
|13:30   ||    '''Charge Item 1e''': Coordinate Detector.    ||    Peter Monahan  
+
|13:25   ||    '''Charge Item 1e''': Coordinate Detector (['''pdf''']) ||    Peter Monahan (15+10)
 
|-
 
|-
|14:00   ||    '''Charge Item 1f and 5''': GEp experiment DAQ. The data volume expected for this experiment            ||    Alex Camsonne  
+
|13:50   ||    '''Charge Item 1f and 5''': GEp experiment DAQ (['''pdf'''])                  ||    Alex Camsonne(15+15)
 
|-
 
|-
|14:30   ||    '''Charge Item 1f''': Trigger based on fADC   ||  Ben Raydo    
+
|14:20   ||    '''Charge Item 1f''': Trigger based on fADC (['''pdf''']) ||  Ben Raydo (15+10)
 
|-
 
|-
|15:50   ||   '''Charge Item 8''': The beam commissioning procedures and polarimetry    ||   William Henry 
+
|14:45   ||   '''Break''' || (10)
 
|-
 
|-
|16:20   ||    '''Charge Item 7, 9''': Safety Documents for GEp   || Evaristo Cisbani 
+
|14:55   ||    '''Charge Item 8''': The beam commissioning procedures and polarimetry (['''pdf'''])   ||   William Henry (10+10)
 
|-
 
|-
 +
|15:15  ||    '''Charge Item 7, 9''': RSAD, Safety Documents for GEp  (['''pdf'''])  || Evaristo Cisbani (10+10)
 
|}
 
|}

Revision as of 14:34, 3 April 2023

Experimental Readiness Review 2023

  • Date: April 24 2023 (Monday)
  • Location: L102
  • ERR Committee
  • ERR Charge ([1])
  • GEp Proposal ([2])
  • GEp Proposal Update ([3])

Agenda

Morning Session
8:00 Closed Session (15)
8:15 Remarks from Chair and Charge Chair (5)
8:20 Charge item 1: The status of the equipment required for this experiment (pdf) BogdanW (10+5)
8:35 Charge Items 1c, 2b, and 6: Proton Polarimeter; ... analyzing power; The simulation and data analysis software status for the experiment ([pdf]) Andrew Puckett (20+20)
9:15 Charge Items 1b, 2a: GEMs and associated electronics; GEM reconstruction efficiency at high rate ([pdf]). Holly Szumila-Vance (20+20)
9:55 Charge Item 3: The responsibilities, manpower and other resources ([pdf]) Mark Jones (10+10)
10:15 Break (10)
10:25 Charge Item 4: The entire beamline, spectrometers, detector configuration been defined, including ownership, maintenance and control during beam operations (pdf) Jessie Butler (15+15)
10:55 Charge Item 1: Design report including modifications to beamline, SBS and detectors (ppt) Robin Wines (15+15)
11:25 Charge Item 1a: Target and scattering chamber configuration ([pdf]) S. Covrig Dusa (10+10)
11:45 Lunch (60)
Afternoon Session
12:45 Charge Item 1d: ECAL calorimeter (ppt) Donald Jones (20+20)
13:25 Charge Item 1e: Coordinate Detector ([pdf]) Peter Monahan (15+10)
13:50 Charge Item 1f and 5: GEp experiment DAQ ([pdf]) Alex Camsonne(15+15)
14:20 Charge Item 1f: Trigger based on fADC ([pdf]) Ben Raydo (15+10)
14:45 Break (10)
14:55 Charge Item 8: The beam commissioning procedures and polarimetry ([pdf]) William Henry (10+10)
15:15 Charge Item 7, 9: RSAD, Safety Documents for GEp ([pdf]) Evaristo Cisbani (10+10)
15:35 Closed Session (2 hours)
17:35 Closeout
Draft of COO (pdf)
Draft of ERG (pdf) and chart (pdf)
Draft of ESAD (pdf)
RSAD from Radcon (pdf)
OSP for Hadron Calorimeter, HCal-J (pdf)
OSP for Coordinate Detector, CDet (pdf)
OSP for GEM detectors (pdf)

More details on Content of the talks

8:00 Closed Session (15)
8:15 Remarks from Chair and Charge Chair (5)
8:20 Charge item 1: The status of the equipment required for this experiment (pdf) BogdanW (10+5)
8:35 Charge Items 1c, 2b, and 6: Proton Polarimeter; ... analyzing power; The simulation and data analysis software status for the experiment ([pdf]) Andrew Puckett (20+20)
9:15 Charge Items 1b, 2a: GEMs and associated electronics; GEM reconstruction efficiency at high rate ([pdf]). Holly Szumila-Vance (20+20)
9:55 Charge Item 3: The responsibilities, manpower and other resources ([pdf]) Mark Jones (10+10)
10:15 Break (10)
10:25 Charge Item 4: The entire beamline, spectrometers, detector configuration been defined, including ownership, maintenance and control during beam operations (pdf) Jessie Butler (15+15)
10:55 Charge Item 1: Design report including modifications to beamline, SBS and detectors (ppt) Robin Wines (15+15)
11:25 Charge Item 1a: Target and scattering chamber configuration ([pdf]) S. Covrig Dusa (10+10)
11:45 Lunch (60)
Afternoon Session
12:45 Charge Item 1d: ECAL calorimeter (ppt) Donald Jones (20+20)
13:25 Charge Item 1e: Coordinate Detector ([pdf]) Peter Monahan (15+10)
13:50 Charge Item 1f and 5: GEp experiment DAQ ([pdf]) Alex Camsonne(15+15)
14:20 Charge Item 1f: Trigger based on fADC ([pdf]) Ben Raydo (15+10)
14:45 Break (10)
14:55 Charge Item 8: The beam commissioning procedures and polarimetry ([pdf]) William Henry (10+10)
15:15 Charge Item 7, 9: RSAD, Safety Documents for GEp ([pdf]) Evaristo Cisbani (10+10)