Difference between revisions of "ERR"

From Hall A Wiki
Jump to: navigation, search
(More details on Content of the talks)
(Agenda)
Line 19: Line 19:
 
| 8:20  ||    '''Charge item 1''': The status of the equipment required for this experiment ([https://hallaweb.jlab.org/wiki/images/6/6c/GEp-ERR_overview.pdf '''pdf'''])      ||        BogdanW (10+5)
 
| 8:20  ||    '''Charge item 1''': The status of the equipment required for this experiment ([https://hallaweb.jlab.org/wiki/images/6/6c/GEp-ERR_overview.pdf '''pdf'''])      ||        BogdanW (10+5)
 
|-
 
|-
| 8:35   ||    '''Charge Items 1c, 2b, and 6''': Proton Polarimeter; ... analyzing power; The simulation and data analysis software status for the experiment (['''pdf'''])     ||     Andrew Puckett (20+20)
+
| 8:50   ||    '''Charge Item 1''': Design report including modifications to beamline, SBS and detectors ([https://hallaweb.jlab.org/wiki/index.php/File:GEn_ERR.pptx '''ppt'''])     ||       Robin Wines (15+15)
 
|-
 
|-
| 9:15   ||    '''Charge Items 1b, 2a''': GEMs and associated electronics; GEM reconstruction efficiency at high rate (['''pdf''']).                           ||  Holly Szumila-Vance  (20+20)   
+
| 9:30   ||    '''Charge Items 1c, 2b, and 6''': Proton Polarimeter; ... analyzing power; The simulation and data analysis software status for the experiment (['''pdf'''])     ||    Andrew Puckett (20+20)
|-
+
| 9:55  ||    '''Charge Item 3''': The responsibilities, manpower and other resources  (['''pdf'''])                                                     ||    Mark Jones (10+10)    
+
 
|-
 
|-
 
|10:15  ||    '''Break'''  ||      (10)  
 
|10:15  ||    '''Break'''  ||      (10)  
 
|-
 
|-
|10:25   ||    '''Charge Item 4''': The entire beamline, spectrometers, detector configuration been defined, including ownership, maintenance and control during beam operations ([https://hallaweb.jlab.org/wiki/images/7/79/ERR_-_SBS_GEp_Installation.pdf '''pdf'''])                                                                                             ||     Jessie Butler (15+15)      
+
| 10:10   ||    '''Charge Items 1b, 2a''': GEMs and associated electronics; GEM reconstruction efficiency at high rate (['''pdf''']).                          ||   Holly Szumila-Vance  (20+20)    
 
|-
 
|-
|10:55   ||     '''Charge Item 1''': Design report including modifications to beamline, SBS and detectors ([https://hallaweb.jlab.org/wiki/index.php/File:GEn_ERR.pptx '''ppt'''])                                       ||       Robin Wines (15+15)
+
|12:45   ||   '''Charge Item 1d''': ECAL calorimeter ([https://hallaweb.jlab.org/wiki/index.php/File:GEp_ECAL.pptx '''ppt''']) || Donald Jones (20+20)    
|-
+
|11:25  ||    '''Charge Item 1a''': Target and scattering chamber configuration (['''pdf'''])      || S. Covrig Dusa (10+10)
+
 
|-
 
|-
 
|11:45      ||  '''Lunch''' || (60)
 
|11:45      ||  '''Lunch''' || (60)
 
|-
 
|-
 
|'''Afternoon''' || '''Session'''
 
|'''Afternoon''' || '''Session'''
|-
 
|12:45  ||    '''Charge Item 1d''': ECAL calorimeter ([https://hallaweb.jlab.org/wiki/index.php/File:GEp_ECAL.pptx '''ppt'''])  ||  Donald Jones (20+20)     
 
 
|-
 
|-
 
|13:25  ||    '''Charge Item 1e''': Coordinate Detector (['''pdf''']) ||    Peter Monahan (15+10)
 
|13:25  ||    '''Charge Item 1e''': Coordinate Detector (['''pdf''']) ||    Peter Monahan (15+10)
Line 46: Line 40:
 
|-
 
|-
 
|14:45  ||  '''Break'''  || (10)  
 
|14:45  ||  '''Break'''  || (10)  
 +
|-
 +
|11:25  ||    '''Charge Item 1a''': Target and scattering chamber configuration (['''pdf'''])      || S. Covrig Dusa (10+10)
 +
|-
 +
|10:25  ||    '''Charge Item 4''': Installation ([https://hallaweb.jlab.org/wiki/images/7/79/ERR_-_SBS_GEp_Installation.pdf '''pdf'''])    ||    Jessie Butler (15+15)       
 +
|-
 +
| 9:55  ||    '''Charge Item 3''': The responsibilities, manpower and other resources  (['''pdf'''])                                                      ||    Mark Jones (10+10)     
 
|-
 
|-
 
|14:55  ||    '''Charge Item 8''': The beam commissioning procedures and polarimetry (['''pdf'''])    ||    William Henry (10+10)
 
|14:55  ||    '''Charge Item 8''': The beam commissioning procedures and polarimetry (['''pdf'''])    ||    William Henry (10+10)

Revision as of 15:26, 3 April 2023

Experimental Readiness Review 2023

  • Date: April 24 2023 (Monday)
  • Location: L102
  • ERR Committee
  • ERR Charge ([1])
  • GEp Proposal ([2])
  • GEp Proposal Update ([3])

Agenda

Morning Session
8:00 Closed Session (15)
8:15 Remarks from Chair and Charge Chair (5)
8:20 Charge item 1: The status of the equipment required for this experiment (pdf) BogdanW (10+5)
8:50 Charge Item 1: Design report including modifications to beamline, SBS and detectors (ppt) Robin Wines (15+15)
9:30 Charge Items 1c, 2b, and 6: Proton Polarimeter; ... analyzing power; The simulation and data analysis software status for the experiment ([pdf]) Andrew Puckett (20+20)
10:15 Break (10)
10:10 Charge Items 1b, 2a: GEMs and associated electronics; GEM reconstruction efficiency at high rate ([pdf]). Holly Szumila-Vance (20+20)
12:45 Charge Item 1d: ECAL calorimeter (ppt) Donald Jones (20+20)
11:45 Lunch (60)
Afternoon Session
13:25 Charge Item 1e: Coordinate Detector ([pdf]) Peter Monahan (15+10)
13:50 Charge Item 1f and 5: GEp experiment DAQ ([pdf]) Alex Camsonne(15+15)
14:20 Charge Item 1f: Trigger based on fADC ([pdf]) Ben Raydo (15+10)
14:45 Break (10)
11:25 Charge Item 1a: Target and scattering chamber configuration ([pdf]) S. Covrig Dusa (10+10)
10:25 Charge Item 4: Installation (pdf) Jessie Butler (15+15)
9:55 Charge Item 3: The responsibilities, manpower and other resources ([pdf]) Mark Jones (10+10)
14:55 Charge Item 8: The beam commissioning procedures and polarimetry ([pdf]) William Henry (10+10)
15:15 Charge Item 7, 9: RSAD, Safety Documents for GEp ([pdf]) Evaristo Cisbani (10+10)
15:35 Closed Session (2 hours)
17:35 Closeout
Draft of COO (pdf)
Draft of ERG (pdf) and chart (pdf)
Draft of ESAD (pdf)
RSAD from Radcon (pdf)
OSP for Hadron Calorimeter, HCal-J (pdf)
OSP for Coordinate Detector, CDet (pdf)
OSP for GEM detectors (pdf)

More details on Content of the talks

8:00 Closed Session (15)
8:15 Remarks from Chair and Charge Chair (5)
8:20 Charge item 1: The GEp experiment plan as approved by PAC47 BogdanW
8:35 Charge Items 1c, 2b, and 6: The simulation and data analysis software status for the experiment Andrew Puckett
9:15 Charge Items 1b, 2a: GEMs and associated electronics; GEM reconstruction efficiency at high rate Holly Szumila-Vance
9:55 Charge Item 3: The responsibilities for each job identified, the manpower and other resources necessary to complete them on time Mark Jones
10:25 Charge Item 4: The entire beamline, spectrometers, detector configuration been defined, including ownership, maintenance and control during beam operations Jessie Butler
10:55 Charge Item 1: Design report including modifications to beamline, SBS and detectors Robin Wines
11:25 Charge Item 1a: Target and scattering chamber configuration S. Covrig Dusa
12:45 Charge Item 1d: ECAL calorimeter Donald Jones
13:25 Charge Item 1e: Coordinate Detector Peter Monahan
13:50 Charge Item 1f and 5: GEp experiment full DAQ Alex Camsonne
14:20 Charge Item 1f: Coincidence trigger based on fADC Ben Raydo
14:55 Charge Item 8: The beam commissioning procedures and polarimetry William Henry
15:15 Charge Item 7, 9: RSAD, Safety Documents for GEp Evaristo Cisbani