Difference between revisions of "January 29th 2024"

From Hall A Wiki
Jump to: navigation, search
(Created page with "*Updates **HCal")
 
 
Line 1: Line 1:
 
*Updates
 
*Updates
 
**HCal
 
**HCal
 +
***looked at cabling fror HCAL trigger
 +
***Question LED calibration : LED was removed from ePAS -
 +
***HCal trigger firmware : Ben starting merging current VTP readout firware with  HCal trigger
 +
*** RF timing - check before start of GEn RP and with beam
 +
 +
**CDet
 +
***Ralph and Angelo working on last half module running and taking cosmics - will be able to get resistors values to equalize the gain
 +
***installation of level translator in spectrometer -vertical rail still need to be mounted - Zac will help to set it up
 +
***will make the VETROC adapters to ECL - will check with electronics group
 +
***will make long ECL cables
 +
**GEn RP
 +
*** David will contact Alex
 +
*** V1190 for active analyzer will be sent from Glasgow
 +
*** need to check with Bill for status of FADC and cabling
 +
 +
*Digital trigger for GEn RP
 +
**BBCal : Arun willing to help for BBCAL FADC trigger
 +
**implement coincidence HCAL and BBCAL in BBCAL VTP
 +
**need to send BBCAL trigger and HCAL trigger to TS for cross checks
 +
 +
 +
 +
*Software review GEp

Latest revision as of 14:30, 29 January 2024

  • Updates
    • HCal
      • looked at cabling fror HCAL trigger
      • Question LED calibration : LED was removed from ePAS -
      • HCal trigger firmware : Ben starting merging current VTP readout firware with HCal trigger
      • RF timing - check before start of GEn RP and with beam
    • CDet
      • Ralph and Angelo working on last half module running and taking cosmics - will be able to get resistors values to equalize the gain
      • installation of level translator in spectrometer -vertical rail still need to be mounted - Zac will help to set it up
      • will make the VETROC adapters to ECL - will check with electronics group
      • will make long ECL cables
    • GEn RP
      • David will contact Alex
      • V1190 for active analyzer will be sent from Glasgow
      • need to check with Bill for status of FADC and cabling
  • Digital trigger for GEn RP
    • BBCal : Arun willing to help for BBCAL FADC trigger
    • implement coincidence HCAL and BBCAL in BBCAL VTP
    • need to send BBCAL trigger and HCAL trigger to TS for cross checks


  • Software review GEp