Difference between revisions of "January 29th 2024"
From Hall A Wiki
(Created page with "*Updates **HCal") |
|||
Line 1: | Line 1: | ||
*Updates | *Updates | ||
**HCal | **HCal | ||
+ | ***looked at cabling fror HCAL trigger | ||
+ | ***Question LED calibration : LED was removed from ePAS - | ||
+ | ***HCal trigger firmware : Ben starting merging current VTP readout firware with HCal trigger | ||
+ | *** RF timing - check before start of GEn RP and with beam | ||
+ | |||
+ | **CDet | ||
+ | ***Ralph and Angelo working on last half module running and taking cosmics - will be able to get resistors values to equalize the gain | ||
+ | ***installation of level translator in spectrometer -vertical rail still need to be mounted - Zac will help to set it up | ||
+ | ***will make the VETROC adapters to ECL - will check with electronics group | ||
+ | ***will make long ECL cables | ||
+ | **GEn RP | ||
+ | *** David will contact Alex | ||
+ | *** V1190 for active analyzer will be sent from Glasgow | ||
+ | *** need to check with Bill for status of FADC and cabling | ||
+ | |||
+ | *Digital trigger for GEn RP | ||
+ | **BBCal : Arun willing to help for BBCAL FADC trigger | ||
+ | **implement coincidence HCAL and BBCAL in BBCAL VTP | ||
+ | **need to send BBCAL trigger and HCAL trigger to TS for cross checks | ||
+ | |||
+ | |||
+ | |||
+ | *Software review GEp |
Latest revision as of 14:30, 29 January 2024
- Updates
- HCal
- looked at cabling fror HCAL trigger
- Question LED calibration : LED was removed from ePAS -
- HCal trigger firmware : Ben starting merging current VTP readout firware with HCal trigger
- RF timing - check before start of GEn RP and with beam
- HCal
- CDet
- Ralph and Angelo working on last half module running and taking cosmics - will be able to get resistors values to equalize the gain
- installation of level translator in spectrometer -vertical rail still need to be mounted - Zac will help to set it up
- will make the VETROC adapters to ECL - will check with electronics group
- will make long ECL cables
- GEn RP
- David will contact Alex
- V1190 for active analyzer will be sent from Glasgow
- need to check with Bill for status of FADC and cabling
- CDet
- Digital trigger for GEn RP
- BBCal : Arun willing to help for BBCAL FADC trigger
- implement coincidence HCAL and BBCAL in BBCAL VTP
- need to send BBCAL trigger and HCAL trigger to TS for cross checks
- Software review GEp