Difference between revisions of "Remaining GEn-RP install tasks"
From Hall A Wiki
Line 3: | Line 3: | ||
* SBS GEMs: | * SBS GEMs: | ||
− | ** techs to install final shielding | + | ** techs to install final shielding block around the electronics hut |
− | ** Check low-levels, cosmics | + | ** Check low-levels, cosmics (in progress) |
− | ** Techs to install scintillators | + | ** Techs to install scintillators today |
* BB GEMs: | * BB GEMs: | ||
− | ** Check low-levels, cosmics | + | ** Check low-levels, cosmics (in progress) |
* Readout: | * Readout: | ||
− | ** Balance VTP fibers amongst crates to optimize ( | + | ** Balance VTP fibers amongst crates to optimize (maybe not needed) |
* High voltage: | * High voltage: | ||
− | ** move HV to working reboot strip (done, but need | + | ** move HV to working reboot strip (done, but need add to documentation) |
− | ** Add variables to accelerator to request for archiving | + | ** Add variables to accelerator to request for archiving (will do today) |
* Update the documentation on the HV and LV operations (before beam) | * Update the documentation on the HV and LV operations (before beam) | ||
* GEM experts on call (setup before beam) | * GEM experts on call (setup before beam) | ||
* Clean up our areas (in progress) | * Clean up our areas (in progress) |
Revision as of 09:01, 29 March 2024
- SBS side LV:
- Ellen to install some controller and readback (in progress)
- SBS GEMs:
- techs to install final shielding block around the electronics hut
- Check low-levels, cosmics (in progress)
- Techs to install scintillators today
- BB GEMs:
- Check low-levels, cosmics (in progress)
- Readout:
- Balance VTP fibers amongst crates to optimize (maybe not needed)
- High voltage:
- move HV to working reboot strip (done, but need add to documentation)
- Add variables to accelerator to request for archiving (will do today)
- Update the documentation on the HV and LV operations (before beam)
- GEM experts on call (setup before beam)
- Clean up our areas (in progress)