Difference between revisions of "Remaining GEn-RP install tasks"

From Hall A Wiki
Jump to: navigation, search
Line 4: Line 4:
 
* SBS GEMs:
 
* SBS GEMs:
 
** techs to install final shielding block around the electronics hut  
 
** techs to install final shielding block around the electronics hut  
** Check low-levels, cosmics (in progress)
+
** Finish cabling, low level testing, cosmics (in progress)
** Techs to install scintillators today
+
  
 
* BB GEMs:
 
* BB GEMs:
** Check low-levels, cosmics (in progress)
+
** Finish cabling, low level testing, cosmics (in progress)
 
+
* High voltage:
+
** move HV to working reboot strip (done, but need add to documentation)
+
  
 
* Update the documentation on the HV and LV operations (before beam)
 
* Update the documentation on the HV and LV operations (before beam)
 
* GEM experts on call (in progress)
 
* GEM experts on call (in progress)
* Clean up our areas (in progress)
+
* Clean up our areas: move our stuff out of the Hall (in progress)
 +
* Update channels in the alarm handler

Revision as of 16:18, 1 April 2024

  • SBS side LV:
    • Ellen to install some controller and readback (in progress)
  • SBS GEMs:
    • techs to install final shielding block around the electronics hut
    • Finish cabling, low level testing, cosmics (in progress)
  • BB GEMs:
    • Finish cabling, low level testing, cosmics (in progress)
  • Update the documentation on the HV and LV operations (before beam)
  • GEM experts on call (in progress)
  • Clean up our areas: move our stuff out of the Hall (in progress)
  • Update channels in the alarm handler