Difference between revisions of "Meeting 2024 05 22"
From Hall A Wiki
(Created page with "<span style="font-size:larger">'''GMn GEM commissioning Meetings: WEDNESDAY 10:30am - 11:30am'''</span> Link to all previous meetings: [https://hallaweb.jlab.org/wiki/index.p...") |
(→GEp preparations) |
||
Line 13: | Line 13: | ||
* Install BB gas distribution from SBS line (DSG will do this) | * Install BB gas distribution from SBS line (DSG will do this) | ||
* Install BB electronics crates and MPDs in new location | * Install BB electronics crates and MPDs in new location | ||
+ | * Prepare and install pixel layers | ||
* Repair/troubleshoot problematic CAEN crates | * Repair/troubleshoot problematic CAEN crates | ||
* Move the GEMs into place on SBS | * Move the GEMs into place on SBS |
Revision as of 09:25, 22 May 2024
GMn GEM commissioning Meetings: WEDNESDAY 10:30am - 11:30am
Link to all previous meetings: GMn GEM Commissioning Meeting
Please use sbs_gems mailing list for plots/communications and HALOG entries relevant to GEMs!
GEp preparations
- De-cable SBS GEMs
- De-cable BB GEMs
- Move GEMs into their respective new frames (front and back tracker)
- Remove layers, isolate shorted sectors, repair APVs as needed
- Joe B will add LV inputs for new GEMs in the stack, we will need to make those cables (4 more layers)
- Install BB gas distribution from SBS line (DSG will do this)
- Install BB electronics crates and MPDs in new location
- Prepare and install pixel layers
- Repair/troubleshoot problematic CAEN crates
- Move the GEMs into place on SBS
- Cable all GEMs
- Readout and troubleshoot
DAQ updates (Ben, Bryan, Alex)
- Implement and test histogram method?