Difference between revisions of "Meeting 2024 05 22"

From Hall A Wiki
Jump to: navigation, search
(Created page with "<span style="font-size:larger">'''GMn GEM commissioning Meetings: WEDNESDAY 10:30am - 11:30am'''</span> Link to all previous meetings: [https://hallaweb.jlab.org/wiki/index.p...")
 
(GEp preparations)
Line 13: Line 13:
 
* Install BB gas distribution from SBS line (DSG will do this)
 
* Install BB gas distribution from SBS line (DSG will do this)
 
* Install BB electronics crates and MPDs in new location
 
* Install BB electronics crates and MPDs in new location
 +
* Prepare and install pixel layers
 
* Repair/troubleshoot problematic CAEN crates
 
* Repair/troubleshoot problematic CAEN crates
 
* Move the GEMs into place on SBS
 
* Move the GEMs into place on SBS

Revision as of 09:25, 22 May 2024

GMn GEM commissioning Meetings: WEDNESDAY 10:30am - 11:30am

Link to all previous meetings: GMn GEM Commissioning Meeting

Please use sbs_gems mailing list for plots/communications and HALOG entries relevant to GEMs!


GEp preparations

  • De-cable SBS GEMs
  • De-cable BB GEMs
  • Move GEMs into their respective new frames (front and back tracker)
  • Remove layers, isolate shorted sectors, repair APVs as needed
  • Joe B will add LV inputs for new GEMs in the stack, we will need to make those cables (4 more layers)
  • Install BB gas distribution from SBS line (DSG will do this)
  • Install BB electronics crates and MPDs in new location
  • Prepare and install pixel layers
  • Repair/troubleshoot problematic CAEN crates
  • Move the GEMs into place on SBS
  • Cable all GEMs
  • Readout and troubleshoot

DAQ updates (Ben, Bryan, Alex)

  • Implement and test histogram method?