Difference between revisions of "Meeting Summaries"

From Hall A Wiki
Jump to: navigation, search
(March 28 Update)
Line 24: Line 24:
 
** Discussion of geometry
 
** Discussion of geometry
 
** Geant4 simulation updates
 
** Geant4 simulation updates
 +
 +
* '''March 28, 2025'''
 +
** Beam on target simulation to increase statistics
 +
** Discussion on collimator and shielding
 +
** Background rate discussion from LH2 and Al

Revision as of 20:10, 28 March 2025

  • Feb 14, 2025
    • Geant4 simulation updates
      • New design of magnet is implemented into the simulation
      • Updates event rate based only on NCal
      • Comparison with previous event rate results (refer to slides from Jan 9, 2025)
    • Discussion in detector design
    • Using E864 calorimeter for neutron arm
  • Feb 28, 2025
    • Continued discussion on E864 calorimeter
    • Geant4 SBS Beam-on-Target Simulation updates
      • Update the event rate calculation
      • Calculate E-beam and estimate the rate
  • March 7, 2025
    • Discussion of anticipated cost of the neutron arm
    • Neutron detection efficiency
    • Geant4 simulation updates
      • New geometry (Lead wall added)
      • E-p elastic peak
  • March 14, 2025
    • Continuing discussion of neutron detection efficiency
    • Discussion of geometry
    • Geant4 simulation updates
  • March 28, 2025
    • Beam on target simulation to increase statistics
    • Discussion on collimator and shielding
    • Background rate discussion from LH2 and Al