Difference between revisions of "HappexIII Work List"
From Hall A Wiki
Line 5: | Line 5: | ||
! DAQ | ! DAQ | ||
| Dustin | | Dustin | ||
− | | AutoDB | + | | |
+ | * AutoDB configuration | ||
+ | * Make list of epics words for DAQ () | ||
+ | |||
|- | |- | ||
! Analysis chain | ! Analysis chain | ||
| Mark | | Mark | ||
− | | Run analysis on HAPPEx II data | + | | |
+ | * Run analysis on HAPPEx II data (Mark) | ||
+ | * QWeak ADC -> PAN (Rupesh) | ||
+ | * Multiplet mode in PAN (fall,Richard) | ||
+ | * Multiplet mode in POSTPAN, Regression (fall) | ||
+ | * Multiplet mode in dithering (spring) | ||
|- | |- | ||
! Detector prep | ! Detector prep | ||
| Dustin | | Dustin | ||
| [[Cosmics Checkout]], PMT linearity tests, LED system, Mounting hardware and angles | | [[Cosmics Checkout]], PMT linearity tests, LED system, Mounting hardware and angles | ||
+ | * PMT DC linearity (Luis) | ||
+ | ** New (Bogdan) Burle PMT | ||
+ | ** Photonics PMT | ||
+ | ** New/Old base | ||
+ | ** Test for He poisoning (strong baseline current and look for double pulsing) | ||
+ | * Calculate light yield from HAPPEx III detector (KK) | ||
+ | * Online LED pulse linearity hardware (Kent) | ||
+ | ** LED mounting (Rupesh) | ||
+ | ** Studies once hardware is available (Rupesh) | ||
+ | * Attenuation study (Rupesh, Dustin) | ||
+ | * Locate/Test/Update mounting hardware (Rupesh/Kent) | ||
+ | * Determine installation spec: angles and position (Dustin) | ||
+ | ** Installation plan, test installation?? | ||
+ | * Test detector pedestal noise (Rupesh) | ||
+ | * Lumi | ||
+ | ** Check running for lumi health | ||
+ | ** Identify spare tubes | ||
+ | ** Test pedestals | ||
+ | * Electronics | ||
+ | ** Relays between counting and integrating mode | ||
|- | |- | ||
! Moller polarimeter | ! Moller polarimeter | ||
Line 32: | Line 60: | ||
* Run 8 cables to source table (Riad) | * Run 8 cables to source table (Riad) | ||
* Modulation | * Modulation | ||
+ | |- | ||
+ | ! Modulation | ||
+ | | | ||
+ | | | ||
+ | * Revive BMW scripts | ||
+ | * Test BMW system | ||
+ | * Add new magnets to arc | ||
+ | * Design PREX modulation system | ||
+ | * Modulation "spec" document (Kent) | ||
|- | |- | ||
! Installation planning | ! Installation planning |
Revision as of 11:31, 16 July 2009
What | Postdoc | Description |
---|---|---|
DAQ | Dustin |
|
Analysis chain | Mark |
|
Detector prep | Dustin | Cosmics Checkout, PMT linearity tests, LED system, Mounting hardware and angles
|
Moller polarimeter | Dustin | Dustin, Luis and Sasha become experts at running the Moller polarimeter |
Compton polarimeter | Mark |
|
Accelerator dev/liason | Mark and Dustin |
|
Modulation |
| |
Installation planning |
| |
Commissioning planning | ||
Documentation and administration |
|
LINKS