Difference between revisions of "Pending issues"

From Hall A Wiki
Jump to: navigation, search
Line 4: Line 4:
 
*Calorimeter Trigger
 
*Calorimeter Trigger
 
*Moller
 
*Moller
 +
*Compton
 +
**Beam diagnostics
 +
**FAD DAQ
 +
**TS check
 
*Calibration scripts
 
*Calibration scripts
 
*Gas Cerenkov
 
*Gas Cerenkov
Line 10: Line 14:
 
*BCM/BPM reinstallation and checks
 
*BCM/BPM reinstallation and checks
 
*Data sync check
 
*Data sync check
*Heliciy
+
*Helicity
 
*Farm
 
*Farm
 +
*RF signal
 +
*Sync check
 +
*Remote reset

Revision as of 23:48, 5 September 2010

Back to DVCS

  • ARS readout
  • Calorimeter Trigger
  • Moller
  • Compton
    • Beam diagnostics
    • FAD DAQ
    • TS check
  • Calibration scripts
  • Gas Cerenkov
  • VDC
  • Calorimeter positioning
  • BCM/BPM reinstallation and checks
  • Data sync check
  • Helicity
  • Farm
  • RF signal
  • Sync check
  • Remote reset