(New page: === Cell Installed, Arp 04, 2010 === * Name: Boris == Oven Test == == Heater Test == Oven is tested on Mar 24, 2010 without cell. Gas flow is 5~6 in mechanical meter, 508 on digital me...)
 
 
Line 1: Line 1:
 +
=== TODO List ===
 +
 +
* {{pass |Clean and organize target lab}}
 +
 +
* {{pass |Around He3 Cell}}
 +
** {{pass |Oven positioning}}
 +
** {{pass |Holding field hardware}}
 +
** {{pass |Air flow test}}
 +
** {{pass |Heater test}}
 +
** {{pass |Setup RTD reader}}
 +
** {{pass |Setup spectrometer}}
 +
** {{pass |Install He3 cell}}
 +
** {{pass |Install target chamber pickup coils}}
 +
** {{pass |Attach RTDs}}
 +
 +
* {{pass |Laser Subsystem}}
 +
** {{pass |Cleaning optics stuff}}
 +
** {{pass |[[Target_Lab_Main#1.2F4-Wave_Plate_Calibration | Q-wave plate calibration]]}}
 +
** {{pass |Install optics}}
 +
** {{pass |low power alignment}}
 +
** {{pass |High power check}}
 +
** {{pass |Optical Pumping Operational}}
 +
 +
* NMR Polarimetery
 +
** {{pass |NMR RF Delivery}}
 +
** {{pass |Pumping chamber pick up coil setup}}
 +
** {{pass |Target chamber pick up coil setup}}
 +
** {{pass |pick up coil alignment}}
 +
** {{pass |NMR code}}
 +
** {{pass |NMR Operational}}
 +
** {{warning|water NMR}}
 +
 +
* {{pass |EPR Polarimetery}}
 +
** {{pass |EPR RF Delivery}}
 +
** {{pass |D2 light collection}}
 +
** {{pass |EPR code}}
 +
** {{pass |EPR line shape}}
 +
** {{pass |EPR frequency lock}}
 +
** {{pass |EPR Operational}}
 +
 
=== Cell Installed, Arp 04, 2010 ===
 
=== Cell Installed, Arp 04, 2010 ===
  

Latest revision as of 17:15, 7 December 2010

TODO List

  • Clean and organize target lab
  • Around He3 Cell
    • Oven positioning
    • Holding field hardware
    • Air flow test
    • Heater test
    • Setup RTD reader
    • Setup spectrometer
    • Install He3 cell
    • Install target chamber pickup coils
    • Attach RTDs
  • Laser Subsystem
    • Cleaning optics stuff
    • Q-wave plate calibration
    • Install optics
    • low power alignment
    • High power check
    • Optical Pumping Operational
  • NMR Polarimetery
    • NMR RF Delivery
    • Pumping chamber pick up coil setup
    • Target chamber pick up coil setup
    • pick up coil alignment
    • NMR code
    • NMR Operational
    • water NMR
  • EPR Polarimetery
    • EPR RF Delivery
    • D2 light collection
    • EPR code
    • EPR line shape
    • EPR frequency lock
    • EPR Operational

Cell Installed, Arp 04, 2010

  • Name: Boris

Oven Test

Heater Test

Oven is tested on Mar 24, 2010 without cell. Gas flow is 5~6 in mechanical meter, 508 on digital meter.

  • If turn on the constant heater only (set temperature -> 20C), heater temp reached 212C, oven reached 154C

Air Flow meter Calibration @ Mar 9, 2010

Air flow meter in oven control chassis is cross calibrated with mechanical air flow meter at target.

Mechanical Flow Meter Digital Flow Meter
1 260
3 390
5 490
7 600

Alarm 4 is set at 280.