Polhe3 meeting 20120111

From Hall A Wiki
Revision as of 11:28, 11 January 2012 by Zwzhao (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Yi gave the general target system check list. He3_Target_Test_Items

Patricia listed cell testing procedure. Cell_testing_method

  • todo list

things can be do in parellel

0. design and make oven bottom piece (do it in parallel) (Yawei, Zhiwen)

1. Field survey: field strength, gradient (do it in parallel) (Jie and Yawei)

2. making new RTD and RTD calibration (particular the one in oven) (Jie Yawei, Chunhua)

3. Fixed the pickup coil in oven, check Q curve. (Jie and Yawei)

4. Seal oven with RTV, check temperature gradient (Jie and Yawei)

5. optical system (Jie, Yawei and Chunhua)

  Laser power measurement
  Calibrations of optics orientations, e.g. λ/4 plates
  Laser polarization measurement
  Optics alignment
  Laser spectrum measurement/Absorption adjustment, after cell mounted

6. temperature tests (all)

7. diffusion rate results analysis (Zhiwen and Jie)

8. double check previous analysis (all)