Agenda and Minutes for 2012/02/15

From Hall A Wiki
Revision as of 12:48, 16 February 2012 by Zwzhao (Talk | contribs)

Jump to: navigation, search
  • CLEO magnet

Zhiwen showed some details of the current CLEO magnet design. It's in a good shape and we should proceed with baffle and other subsystems with the new magnet. pptx pdf ( There are more slides than what were shown in the meeting. )

  • For GEM readout design, Nilanga needs some input from tracking by sometime in April.
  • Before the next collaboration meeting (4/13-14), we will have a couple of extended weekly meetings to cover subsystem in details. we shall decide on dates soon and send out reminders.