Target Slow Control

From Hall A Wiki
Revision as of 14:50, 24 July 2008 by Jinhuang (Talk | contribs) (Hall IOC)

Jump to: navigation, search

Target Slow Control Component

Target slow control consists of two EPICS IOCs located in Hall and the new target lab, as shown in the target system diagram

Hall IOC

The IOC in the Hall is behind the Green Wall. It has

  • 3 Holding field current meter, Fluke45, GPIB
  • 1 Oven temperature control, Omega, serial
  • 1 Heater air flow meter, DP41, serial
  • 1 Heater temperature read, DP41, serial
  • 1 Target ladder stepping motor, NF90, serial
  • 11 oven temperature sensors, 4 wire RTD, wire
  • 2 Spin Status Signal, NIM Logical Standard. 1 stand for spin along holding field direction; another for antiparallel.

New Target Lab IOC

New target lab is located back to the counting house. The IOC is mainly for the control of the lasers

  • 6 Single FAP lasers, Coherent, serial
  • 3 Duo FAP lasers, Coherent, serial