Target Operator Check List
From Hall A Wiki
Revision as of 16:42, 3 November 2008 by Jinhuang (Talk | contribs) (→After Call for a Bean on Request to MCC)
Target Operator Should Finish This check list for every shift.
Every Half Hour
- Pumping Laser Absorption Spectrum
- No Error in Spin Flip Control Status Window
- 5 Heart Beats are on for Spin Flip Main Window
Every 2 Hour
- Check polarization drift
- Check Cell Temperature
- Check Oven Temperature
Every Shift
- Generate a Report from Spin Flip Main Window
- Screen Shot Pumping Laser Absorption Spectrum
- Screen Shot Laser Control Window
- Screen Shot Cell Temperature Reading
After Call for Beam to MCC
- Check Raster Size
- Check Beam Current
- Check Trigger Rate