Target Enclosure Work Checklist

From Hall A Wiki
Revision as of 19:16, 3 November 2008 by Yqiang (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Please fill up this check list every time before close up for He3 enclosure.

  • He3 Cell
    1. He3 Cell Status (integrity, color)
    2. 5 RTDs on He3 Cell Target Chamber
    3. Check Oven Leak
  • Reference Cell
    1. Reference Cell Status(integrity, color)
    2. 3 RTDs on Ref Cell
  • Beam Window
    1. Upstream Beam Window
    2. DownStream Beam Window
  • Other
    1. No tools or unnecessary items left in chamber
    2. Cooling Jets (ON/OFF, Direction Correct?)
    3. Cables are still secured?