Wednesday October 4, 2017 2:00pm ET
From Hall A Wiki
Last meeting: Wednesday May 24, 2017 2:00pm ET
Agenda
- Task list/status
- tolerance analysis
- material irradiation
- radiation loads
- impact of environmental variations
- floor loading
- fringe field impact
- Status of MIT/JLAB work
- funding for new work
- MIT/SBU spectrometer prototype fabrication status
- a bulleted list of the objectives of prototype testing
- a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
- a breakdown of the MIT request
- coil tests
- collimator/apparatus engineering
- other activities
- Next meeting
Minutes
- Task list/status
- tolerance analysis (in progress at Manitoba)
- material irradiation (Rakitha will provide info to Juliette and MIT)
- radiation loads (Rakitha will provide info to Juliette and MIT)
- impact of environmental variations (Juliette will initiate conversation)
- floor loading (MIT should approach JLAB about doing this estimate)
- fringe field impact (fully at Manitoba)
- EB meeting this week
- Collaboration meeting mid-month
- Status of MIT/JLAB work
- funding for new work - request is in; they are considering it
- MIT/SBU spectrometer prototype fabrication status
- a bulleted list of the objectives of prototype testing
- a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
- Ernie should continue to be the point man with Everson-Tesla
- a breakdown of the MIT request
- coil tests
- collimator/apparatus engineering
- other activities
- Next meeting