Wednesday, January 31, 2018 3:00pm ET
From Hall A Wiki
previous meeting << >> following meeting
Logistic information
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 734 609 7559 Bluejeans link: https://bluejeans.com/7346097559
Agenda
- Status reports
Minutes
Attendance: Juliette, KK, Cameron, Ernie, Jim, Rakitha
- Prototype coil
- water test plumbed incorrectly
- run in series instead of parallel
- shipping on winding device
- B-stage - stuck together turn-to-turn when moved to vacuum chamber
- rectangle with hole
- radius on corners
- fiberglass tape half-lapped
- B-stage is pre-impregnated tape vs. just tape
- w/ latter back-fill with epoxy
- former does not make a monolithic structure
- ground wrap after w/ fiberglass tape
- B-stage can be made with rad-hard epoxy
- would still need to make with vacuum impregnation to remove voids
- JLAB job, admin by JLAB
- testing water flow at MIT-Bates
- water test plumbed incorrectly
- Other priorities
- Radiation dose
- using number from spec sheet
- not sure if it is just neutrons or E&M
- maximum dose limits are very high, but we're running for 30k hours
- needs to still look at e- and gamma
- Sensitivities
- segmented coil
- Radiation dose
- Magnet Advisory Group Meeting soon
Return to Teleconferences
Return to MOLLER at 11 GeV E09-005