November 13th 2020
From Hall A Wiki
- Updates
- HCAL
- cosmics working on right side - checking cabling - still DMA transfer error
- prescale set to 0 to get all the trigger - was set to 1 so was taking half
- could try to swap FADC from bottom to top crate
- try with bus analyzer ?
- Bryan will check readout list
- Bigbite Shower
- PMTs replaced , starting taking data yesterday - will take data over week-end - and switch to CODA3 maybe Tuesday
- INFN GEM
- running cosmics on week-end with CODA3 - running stable - replacing cable trays and will retest - no need to power cycle low voltage - 3 M events run
- UVA GEM
- replaced one MPD which was giving read out errors - need to look at data - no errors seen with new MPD
- BigBite GEM
- set of 5 APV for testing in TEDF, crates and modules installed
- Hodoscope
- Mark gave HV write up, can control HV
- next set of 16 almost ready
- will setup TDC after switch to CODA3
- CDet
- still debugging few individual channels
- Update on Wednesday - might need to reboot after - update in mounting /site , update should be done through puppet
- LHRS
- getting started with intel CPUs and new TI for LHRS
- HCAL
- GEM DAQ rate limitiation : Ben working on simulation will