Halls A and C Spectrometer Support Group Whiteboard

From Hall A Wiki
Revision as of 12:40, 3 May 2021 by Fansler (Talk | contribs)

Jump to: navigation, search

Heaters for HMS magnet flags

Release Right Shield House door controls from support and drop them down - tie back to platform legs

Controls for corrector coils

Re-tap the SBS supply main transformer for full power

re-install ground fault detector in LQ1 supply - requires configuration of module

connect power and LCW to BB supply on R-arm platform

re-locate displays for hacweb11 and 14

clean up R-arm supply platform

clean up L-arm supply platform

Troubleshoot Hall A right arm snout

Install new liquid level meters on SHMS