Halls A and C Spectrometer Support Group Whiteboard

From Hall A Wiki
Revision as of 18:34, 25 March 2023 by Segal (Talk | contribs)

Jump to: navigation, search

Priority Items

SBS air compressor maintenance

Oscillator for LN2 level meter

Install pressure sensor in warm return in ESR

Replace/repair dead MAGNET ON signs in Hall C

BigBite Argon manifold pressure sensor erratic. Need to clean the connections?

Some of the SBS magnet bus bars have been running hot. Do we need to re-torque them?

Readout for LCW pressure sensors added at end of beamline walkway (not started)

Add "T's" and pump out ports to HMS magnet vacuum gauge ports.-Steve didn't want work done.

Would Be Good To Do Items

Remove actuators from right arm magnets. (Dipole/Q3 complete)

clean up R-arm supply platform

clean up L-arm supply platform

Build new controller for testing and calibration warm return valves for Hall C

Build local valve control boxes with local read out.

op check/repair hall C vacuum gauges.

Re-route the Danfysik extension cables inside the HMS hut - get the excess off the floor

Cut and install poly shielding around HVAC controls on the Right HRS

Do We Still Need To Do These?

Possible Future Items

Remote reset for Hall C spectrometer motion (maybe next year)