FPJ test May2010

From Hall A Wiki
Revision as of 15:54, 28 May 2010 by Jixie (Talk | contribs)

Jump to: navigation, search

Go back to Moller Wiki


  1. On May 22nd, Jixie and Amhed did a pulse test with the FADC DAQ. Pulse signals with 10ns width and 11.58us period was feed into CL1 and SC1, where the signal fed into the SC had various integer time delay from 0 to 16 ns.

Check the log file here.

  1. Amhed did some other test later, need to be added
  2. Roman did high frequency test run with the Old DAQ, need to be added later