Lab Records

From Hall A Wiki
Revision as of 17:15, 7 December 2010 by Pzhu (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

TODO List

  • Clean and organize target lab
  • Around He3 Cell
    • Oven positioning
    • Holding field hardware
    • Air flow test
    • Heater test
    • Setup RTD reader
    • Setup spectrometer
    • Install He3 cell
    • Install target chamber pickup coils
    • Attach RTDs
  • Laser Subsystem
    • Cleaning optics stuff
    • Q-wave plate calibration
    • Install optics
    • low power alignment
    • High power check
    • Optical Pumping Operational
  • NMR Polarimetery
    • NMR RF Delivery
    • Pumping chamber pick up coil setup
    • Target chamber pick up coil setup
    • pick up coil alignment
    • NMR code
    • NMR Operational
    • water NMR
  • EPR Polarimetery
    • EPR RF Delivery
    • D2 light collection
    • EPR code
    • EPR line shape
    • EPR frequency lock
    • EPR Operational

Cell Installed, Arp 04, 2010

  • Name: Boris

Oven Test

Heater Test

Oven is tested on Mar 24, 2010 without cell. Gas flow is 5~6 in mechanical meter, 508 on digital meter.

  • If turn on the constant heater only (set temperature -> 20C), heater temp reached 212C, oven reached 154C

Air Flow meter Calibration @ Mar 9, 2010

Air flow meter in oven control chassis is cross calibrated with mechanical air flow meter at target.

Mechanical Flow Meter Digital Flow Meter
1 260
3 390
5 490
7 600

Alarm 4 is set at 280.