Pedestal Setup

From Hall A Wiki
Revision as of 14:25, 21 June 2010 by Plazony (Talk | contribs) (New page: 1) Do a run with no High Voltage and coincidence 1 2) Analyze the Data using "analyzer gem_replay.C" under the /gem_replay/ directory 3) emacs plotped_richard.C and change the root file ...)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

1) Do a run with no High Voltage and coincidence 1

2) Analyze the Data using "analyzer gem_replay.C" under the /gem_replay/ directory

3) emacs plotped_richard.C and change the root file to the run.

4) root plotped_richard.C to get X and Y peds

5) emacs db_T.gem.dat under analyzer/DB/<Latest date>/

6) Copy and paste new peds into the file.