Polhe3 meeting 20110713

From Hall A Wiki
Revision as of 15:43, 13 July 2011 by Zwzhao (Talk | contribs) (New page: * progress ** new cell and oven bottom piece *** Mike should have the first cell sent out to UVa now, need confirmation though. *** Jie did a summary of [[Convection_Cell#Transitivity_cell...)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • progress
    • new cell and oven bottom piece
      • Mike should have the first cell sent out to UVa now, need confirmation though.
      • Jie did a summary of Convection_Cell#Transitivity_cell_tolerance
      • Alan starts to design and make the oven bottom piece to according to the drawing and tolerance, hopefully finish around the time when the new cell arrives before end of July.
    • RTD reading
    • pulse NMR
    • temperature optimization test
      • redid 210C and 230C spin up.
      • reorganized results
    • diffusion mode measurement
    • convection flow study
      • identify small heater to as the flower driver.
    • transfer tube wall measurement
      • found ultrasonic gauge
  • todo
    • new cell and oven bottom piece (zhiwen)
      • follow up
    • RTD reading (Jie)
      • check PC RTD reading setting
      • do calibration once we can take RTD out
      • During the transitivity experiment, the reading may have same setting problem. how much it affect results, need to be checked. refer to

https://hallaweb.jlab.org/wiki/index.php/Oven_Control#Input

    • pulse NMR (all)
      • order items and refine the list (Zhiwen)
      • find or make coil, matchbox (Chunhua)
      • write code for reading (Jie)
      • setup (all)
    • diffusion mode measurement (Chunhua)
      • make two coils to confine field more.
      • measurement NMR at different RF power, derive optimal H1 to destroy field
      • do another test
    • convection flow study (Zhiwen)
      • find out if heater material has magnetic and order them
    • temperature optimization test (Chunhua)
      • redo 230 spin down
      • improve analysis and check fitting with error estimation
      • water measurement
    • transfer tube wall measurement (Jie)
      • do it
  • Calendar
Week Tasks To be done by status
6/29-7/3 Complete temperature testing with RTD correction study Chunhua, Zhiwen, Jie for RTD part
Tolerance measurement Jie, Zhiwen done
ID supply list for pulsed NMR Zhiwen part
7/7-7/13 Conduct diffusion test Chunhua, Zhiwen, (Jie) part
general inventory check and ordering Chunhua, Zhiwen part
7/14-7/20 (tentative) Expect to receive the new cell. Maybe oven fit check (but will not mount for testing), adjustment by Al G. if needed Chunhua, Zhiwen
Pulsed NMR prep Chunhua, Zhiwen
7/20-8/15 (tentative) Pulsed NMR setup on a traditional cell Chunhua, Jie