Thursday, November 20: OWL Shift

From Hall A Wiki
Revision as of 16:05, 19 November 2014 by Vasulk (Talk | contribs)

Jump to: navigation, search

Go back to Daily Run Plan Daily Run Plans

  • General considerations
    • Vincent Sulkosky is the current Run Coordinator. Please contact me directly via RC phone 757-876-1787
    • Follow the generic Instructions for shift takers
    • Shift leaders: Please make sure to fill out the beam time accounting form and write a "Shift Summary" log entry at the end of your shift regardless if there is beam or not.
    • In general, technical staff should not be contacted by the shift crew - please call the RC first.
  • Instructions for this shift
    • The target operator is required to supervise the cryo-target.
    • Kinematics, DVCS Kin1: Ebeam = 7.3 GeV, PLHRS=2.71 GeV, Theta_HRS=22.83, Theta_calo=12.35
    • Make sure to use the DVCS CODA configuration for all runs (even when taking single arm HRS data).
    • MCC should be finishing up beam studies near the beginning of Owl shift with hopefully stable CW beam operations to Halls A and D.
    • After completion of the beam tuning for Hall A, execute the following steps of the "Beamline" run plan here. For this part of the plan - contact Carlos (contact info on the white board).
      • Note that we will NOT be going through the Compton chicane.
      • Initial BPM/Raster checks/Beam centering
      • BPM Calibrations (Bullseye Scan) [1-2 hours]
      • Superharp Scan with Raster off/on
    • If time remains, start spectrometer checkout and begin looking for HRS-calorimeter coincidences. For this part of the plan - contact Carlos and Paul (contact info on the white board). The calorimeter HV will need to be turned on and put in the correct position - this will be done by Carlos or his assigned substitute.
    • Preliminary BCM Calibrations up to 10-20 μA, or what MCC can deliver if lower than this.