Saturday, Mar. 05: OWL Shift
From Hall A Wiki
Go back to Daily Run Plan Daily Run Plans
Previously...
- Production data (Kin48_3)
Specific mission
- Note:
1/ Continue production mode
- 15uA through Compton chicane
- LH2 target
- DVCS ON
- LHRS=2.92GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)
- PreScaleR : PS1=PS2=PS3=1, && PS8=200
- PreScaleL : PS9 =1, + DVCS config.
- Issues:
- Can't control the Alpha Y axis of the raster. (MCC tried reboot but failed) - 1AM
- I came to CH and called to Bill to check
- Bill Gunning came to replace the PS (the escorted access)
- New PS initialization failed / dump diffuser issue, MCC reboot again but IOChla fail again (multi-times escorted access)
- From MCC(9:00AM) meeting, PD said it might be a remote reset switch (needs an analysis by expert).
- If happen again, the remote reset switch will be replaced and more investigate detail during access.
- Raster seemed controllable by MCC (look at the Oscilloscope), but spot++ data showed X did not change at all any current
- Expert called, Bob came and investigating... HALOG
- Meantime, CHL is crashed. Hall-A is now controlled access - 1PM
- Repair raster is done HALOG
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++