APEX Experimental Readiness Review 2016
From Hall A Wiki
Overview
Experimental Readiness Review 2016
Time and Location
- Date: 07 April 2016 (Thursday)
- Location: JLab CEBAF Room F224-F225
Agenda (talks)
8:30 | Closed Session | |
9:00 | Remarks from Chair and Charge | Chair, ERR Committee |
9:10 | Physics overview (Media:overview.pdf) | Philip Schuster (15+5) |
9:30 | Charge Item 1&5: Design of the beam line items (excluding target) (Media:design.pdf) | Robin Wines (20+10) |
10:00 | Charge Item 2&5: Target design, thermal analysis and plans for the target (including decommissioning) (Media:target.pdf) | Silviu Covrig (20+15) |
10:35 | Break | |
10:50 | Charge Item 3: Beam line magnetic shielding, beam analysis and commissioning (Media:beamline.pdf) | Yves Roblin (15+10) |
11:15 | Charge Item 4: Radiation level analysis (Media:radiation.pdf) | Maduka Kaluarachchi (20+15) |
11:50 | Charge Item 5: Status of equipment (detectors) (Media:equipment.pdf) | Gregg Franklin (15+5) |
12:10 | Working Lunch | |
Afternoon | ||
13:30 | Charge Items 6&7: Equipment installation plan (Media:installation.pdf) | Jessie Butler (20+10) |
14:15 | Charge Item 8: Responsibilities for carrying out each job (Media:respons.pdf) | Bogdan Wojtsekhowski (10+5) |
14:30 | Charge Item 9: Documentation for all (Media:doc.pdf) | Rouven Essig (15+5) |
14:50 | Charge Item 9: Readiness of DAQ full rate capability (Media:APEX_DAQ.pdf) | Kalyan Allada (10+5) |
15:05 | Charge Item 9: High-rate events analysis (Media:analysis.pdf) | Seamus Riordan (10+5) |
15:20 | Closed Session | |
18:10 | Close Out |