Friday, June 8, 2018 2PM ET

From Hall A Wiki
Revision as of 13:49, 8 June 2018 by Cameronc (Talk | contribs)

Jump to: navigation, search

Previous meeting: Friday, May 25, 2018 2PM ET

Media:KK's MOLLER Task List.pdf

Task List Summary


Agenda

  • Simulation coding updates
    • Daniel and Audrey are adding generators for specific upcoming SBU simulation tasks
    • Designing a function-defined radial position at downstream detector generator
    • Also improving the "external" root output file -> input file generator
  • Shielding update
    • Getting the newest version of remoll (v2.0.0 -> Master) to work with all geometries
    • Updating analysis scripts to use the new data structures
  • Air/Vacuum Study
    • Waiting for the geometry definition in the radiation shielding to be verified by Cameron and Chandan to make a new, more comprehensive set of Air/Vacuum/Helium test geometries

Attendance:

Attendance:

Minutes



Return to Teleconferences
Return to MOLLER at 11 GeV E09-005