March 5th 2021

From Hall A Wiki
Revision as of 12:14, 5 March 2021 by Camsonne (Talk | contribs)

Jump to: navigation, search
  • Updates
    • HCAL
      • starting setting up overlapping clusters - will take cosmics next week to test
      • Juan Carlos working on the library for the DAC
      • Bryan updated FADC configuration libration ( issue setting up window correctly )
      • studies amplifier saturation : saturates before the FADC

linear up to 3 V ( seems FADC at 2V is ok with attenuation )

      • Bryan almost done with DVCS LED pulser - need VME address - Alex will send picture - Board is in slot 15
    • BB Shower
      • setting up trigger monitor - list of what is needed
        • NIM crate + 4x NIM ECL connector ( already there ) - 52 BNC cables from ESB

F1 TDC installed -

      • Power supply for threshold : still need to load firmware
      • FADCs : 4 from Brads will need to go to RP - 6 FADC on order - 2 from UMass -
    • BB Hodoscope
    • BB GRINCH
    • LHRS
    • GEM INFN
    • GEM UVA
    • GEM TEDF