September 10th 2021

From Hall A Wiki
Revision as of 10:31, 10 September 2021 by Camsonne (Talk | contribs)

Jump to: navigation, search
  • Updates
    • Rate tests
    • HCAL
    • Bigbite Shower
    • BigBite Hodoscope
    • GRINCH
    • Bigbite INFN GEM
    • Bigbite UVA GEM
    • Scalers
    • Beamline
    • HV
    • RF
      • plug in FADC ?
      • can add F1 TDC
    • Helicity


  • On going tasks
    • Cable to weldment ( Jack ? )
    • cabling scaler/beamline crate ( David , Bob 0%)
    • HRS to TS and timing ( Bob, Maria 0% )
    • EPICS / start End of run logging script (Alex, Bob 0% 09/15 )
    • script check MPD sync ( Ben , Andrew )
    • RF (Alex, Bob )
    • sync check scripts ( Andrew , Alex )
    • Hodoscope v1190 clock ( Alex , Mark )
    • Full configration all crates ( Alex, Bryan )
    • data rate test with new computer and 3 VTPs ( Alex, Bryan )
    • test GEM zero supression ( Sean, Holly )
    • GEM cosmics ( Sean, Holly )
    • Shower cosmics (Arun, Provokar )
    • HCAL cosmics (Scott)
    • GRINCH cosmics ( Bradley )
    • Hodoscope cosmics ( Ralph )
    • DAQ documentation ( Alex, Rachel )
    • suggest taking all detectors cosmics every night
    • add scaler crate to full config
    • coincidence trigger
    • EDTM
  • Issues
    • Shower FADC bad channel
    • HCAL ROC16 fiber
    • warning PEB ROC
    • Shower F1 issue at high rate
  • Status software in a-onl@aonl1
  • GRINCH
    • still need to install - need to check if commits were merged
    • still running locally -
  • Shower
    • installed
    • one script working with TS files
  • GEM
    • Andrew still need to set it up there
  • Hodoscope
    • installed
  • HCAL
    • setup and can look at data


  • All crates
  • Bigbite config : GEM GRINCH Hodoscope
  • need add HCAL and HRS