Remaining GEn-RP install tasks
From Hall A Wiki
- SBS side LV:
- Ellen to install some controller and readback (in progress)
- SBS GEMs:
- techs to install final shielding blocks around the electronics hut
- Check low-levels, cosmics
- Techs to install scintillators next week
- BB GEMs:
- Check low-levels, cosmics
- Readout:
- Balance VTP fibers amongst crates to optimize (after GEMs are installed)
- High voltage:
- move HV to working reboot strip (done, but need to add to gui)
- Add variables to accelerator to request for archiving
- Update the documentation on the HV and LV operations (before beam)
- GEM experts on call (setup before beam)
- Clean up our areas (in progress)