Run Plan

From Hall A Wiki
Revision as of 06:12, 16 March 2010 by Rshneor (Talk | contribs)

Jump to: navigation, search



  • HRSs checks]]


  • Momentum scane for BigBite commission, H(e,e'p) , H(e,p) and C(e,p) Kin A 1,2,3,6 (and Kin G2).
  • Energy change 1 pass to 2 pass.


  • Continue momentum scale for BigBite calibration, H(e,e'p), H(e,p) and C(e,p) Kin A 4,5 (and Kin C1,G1).


  • BigBite angle change. (Rotate BB to an angle so that there will be no obsticle in the line of sight from target to the n-array).


  • n-array commision, Kin B1


  • Change set-up to BB and N-Array both at 99 Deg + Energy change 2 pass to 4 pass


  • Singles rates study


  • D(e,e'pn) X<1, Kin D1

End of commision

  • D(e,e'pn) X>1, Kin E1


  • SRC Run, low Momentum range, Kin F1


  • SRC Run, High Momentum range, Kin F2