Task assignement

From Hall A Wiki
Revision as of 08:28, 23 August 2010 by Camsonne (Talk | contribs)

Jump to: navigation, search

Back to DVCS

Previous tables

Task assignement August 15th 2010

Experiment tasks

  • scalers
  • sync check
  • HV
  • HRS calibration
  • Beamline cablibration
  • dead time
  • lumi


Name Expertise Secondary expert Task list Completion level / Completed / Left to be done Estimated completion date Main task
Alexandre Camsonne ARS DAQ, Slow control, decoding, paperwork Trigger
 * ARS test readout
 * ARS final readout
 * Buffering test
 * DVCS HRS Trigger implementation
 * Test decoder
 * Slow control LED
 * Slow control current ADC
 * HRS integration
 * COO
 * ESAD
 * RSAD
 * TOSP
 * 100 % ( need implement checks and not working 100 % )
 * 40 % ( crates being added )
 * 60 % ( need connect busy and create buffered read out )
 * 20% ( Rack in HRS )
 * 60 % ( need implement checks )
 * 50 % ( hardware ok - need write C functions driver and ROOT interface )
 * 80 % ( ADC and patch ready - need to cable and test )
 * 20% ( waiting for crates to be in HRS )
 * 90 % ( need edit files ) 
 * 30 % ( need adapt to DVCS )
 * 90 % ( Pavel waiting to send for signatures )
 * 0 % ( still not found old one )
 * NA
 * Aug 30 th
 * in progress 08/25/2010
 * 08/30/2010
 * 08/30/2010 
 * 08/25/2010 ( 1 day )
 * 08/30/2010 ( cabling needed )
 * when everything in HRS, no later than september
 * 08/25/2010
 * 08/30/2010
 * 09/5/2010
 * 09/01/2010 
Setup DVCS crates in HRS
Eric Fuchey Calibration pi0, Photon Compton, RG213 RG213
Florian Itard Shift schedule, RG213
Magalie Magne Electronics ARS + Calorimeter triggger
Hisham Albataineh RG213 RG213 RG213
Carlos Munoz Software, Survey, (Elastic calibration ?),MySQL *Waveform analysis
 *Survey
Julie Roche Software, curing, cosmics paddle DVCS analysis on adaq DVCS analysis on adaq
Charles Hyde Run plan Run plan Run plan
Robert Michaels Helicity, HRS trigger, CompSimple
  • Helicity
  • HRS trigger
  • CompSimple
  • 80 % - checks left ?
  • 50 % - reuse APEX - need Charles timing and logic diagrams - Magalie logic module to complete
Sophia Iqbal ( until august 31st ) Online GUI, EPICS start/end run
Kalyan Allada Lumi Lumi

}