Pedestal Setup

From Hall A Wiki
Revision as of 14:55, 31 May 2011 by Plazony (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • Do a run with no High Voltage on GEM and coincidence 1
  • Analyze the Data using "analyzer gem_replay.C" under the /gem_replay/ directory
  • start Root: root
  • In root type : .x gem_open.C ( enter run number)
  • In root type : .x gem_plotped_mkj_xb.C
  • emacs db_T.gem.dat under analyzer/DB/<Latest date>/
  • Copy and paste new peds into the file.