Summer 2011 GEM runs

From Hall A Wiki
Revision as of 13:02, 25 July 2011 by Plazony (Talk | contribs)

Jump to: navigation, search
RUN # Source/Cosmic/Pedestal Date Start Time End Time HV # of events notes
569 Pedestal Jun 10 2011 0V First pedestal run with setup. Bad data.
570 Pedestal Jun 10 2011 0V Checking signals from all gems
571 Pedestal Jun 10 2011 0V GEMs were NOT grounded :
ADC vs. chan number    
Mean vs. chan number 
RMS vs. chan number 
572 Pedestal Jun 10 2011 16:05:50 16:07:56 0V 2801 GEMs were grounded. Pedestal put in in DB/20110610/db_T.gem.dat
Good pedestal run : ADC vs. chan number ,   
Mean vs. chan number    RMS vs. chan number 
573 Cosmic Jun 10 2011 16:56:20 3.65/3.642V 5400 Problem with Bottom scintillator. Fixed by using other Anode output. Not good fiddling with trigger
574 Cosmic Jun 10 2011 17:11 Jun 13 9:42 3.65/3.642V 74956 Trigger is Scint TOP&Bot or LeadGlass
575 used to only test scint and lead glass signals.
575 Cosmic June 13 2011 13:26 3.65/3.642V Ethernet cord became disconnected
576 Cosmic June 13 2011 14:25 3.65/3.642V Run stopped right away.
577 Cosmic June 13 2011 N/A 3.65/3.642V 26349 Computer and VME crate were turned off??
578-592 Source 3.7/3.7v Problems recovering from power outage.
606 Pedestal
607 Source 14:51 14:53 3.7v 7613 90 SR Source Center
608 Source 15:00 15:02 3.7v 7217 90 SR Source Center
609 Source 15:08 15:11 3.7v 7151 90 SR Source -x -y
610 Source 15:14 15:16 3.7v 7160 90 SR Source x=0 -y
611 Source 15:19 15:23 3.7v 7139 90 SR Source +x -y
612 Source 15:24 15:26 3.7v 73141 90 SR Source +x y=0
609 Source 15:08 15:11 3.7v 7151 90 SR Source -x -y