G2PGEP Daily Run Plan

From Hall A Wiki
Revision as of 14:16, 2 September 2011 by Jixie (Talk | contribs) (New page: This is just a template of what should be shown and how to update this page. '''RC: Jixie Zhang'''<br> http://www.jlab.org/~adaq/halog/html/1011_archive/101117000302.html 11-16 swing...)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

This is just a template of what should be shown and how to update this page.

RC: Jixie Zhang
[11-16 swing], [11-17 owl], [11-17 day] ← change HRS polarity
[11-15 swing], [11-16 owl], [11-16 day]
[11-14 swing], [11-15 owl], [11-15 day]
[11-13 swing], [11-14 owl], [11-14 day]
[11-12 swing], [11-13 owl], [11-13 day] ← Jump in downstream bcm gain [halog]
[11-11 swing], [11-12 owl], [11-12 day]
[11-10 swing], [11-11 owl], [11-11 day] ← VWien=90 deg, HWien=-61 deg, Spin Soleinoid =90 [1] ,← jump in deadtime
[11-9 swing], [11-10 owl], [11-10 day]
[11-08 swing], [11-09 owl], [11-09 day]
[11-07 swing], [11-08 owl], [11-08 day]
[11-06 swing], [11-07 owl], [11-07 day]