  • progress
    • new cell and oven bottom piece (zhiwen)
      • The first cell has not been filled due to some complications in the gas system. The second cell is not delivered and won't be until the first one is filled. Alan is working on oven bottom piece.
    • temperature optimization test (all)
      • redid 230 spin down, did 225 spin down (zhiwen)
      • Checked fitting with error estimation, in preparation for notes (Chunhua)
      • water calibration is in progress, Chunhua is calculating flux (Jie, Chunhua)
    • pulse NMR (all)
      • recorded down the current NMR setup, in preparation for pNMR setup. (Jie)
      • Jie is writing labview program for DAQ (Jie)
    • convection flow study (all)
      • 2 heater is tested. (Jie)
      • installed two new RTD lines. (Jie, Chunhua)
    • transfer tube wall measurement (Jie)


  • Calendar
timeline Tasks To be done by status
new cell and oven bottom piece
9/7-9/21 receiving and check fitting all
diffusion mode measurement
9/7-9/14 make a zapper coil or a pair of coils to confine field better Chunhua
9/7-9/14 do the test all
convection flow study
9/7-9/14 make a zapper coil or a pair of coils to confine field better Chunhua
9/7-9/14 do calibration on old and new RTD. connect RTD readout/control in labview Jie
temperature optimization test
9/7-9/14 do Q-curve measurement, and finalize water cell calibration. all
9/7-9/21 improve analysis, check fitting with error estimation and prepare plots for a note. Chunhua
pulse NMR
9/7-9/21 pNMR setup. test the transmitter circuit and receiver circuit separately. combine them once diffusion mode test is finished. Write the labview program and make a test Jie
9/7-9/21 find or make coil and test it with capacitor matchbox Chunhua
9/7-9/21 do a test all