G2p Safety Readiness Review

From Hall A Wiki
Revision as of 22:26, 10 January 2012 by Slifer (Talk | contribs)

Jump to: navigation, search

Overview

On January 17, JLab will review the readiness of E08-027/007 to safely begin production data taking. This wikipage is the central repository of all collaboration information relevant to this review. The official charge is here. In addition, the committee has also asked us to address these specific questions.


Review Agenda

January 17, 2012; JLab F113, 1:00-5:00 pm

Topic Presenter
Welcome and Introduction J. P. Chen
Polarized Target C. Keith
Hall A Beamline T. Michalski
Beamline Commissioning Y. Roblin
Engineering, Design & Field Mapping R. Wines
Hall A Installation, Mechanical Structures E. Folts
Radiation Control P. Degtiarenko
Radiation Control G. Kharashvili
Experiment Preparation K. Slifer


Note to Presenters: Please send your presentation and supporting documents to slifer@jlab.org.

All presentations will be posted here

All documentation will be posted here


Notes