Polhe3 meeting 20120111
From Hall A Wiki
- note, we missed the minutes for previous meetings on 11/16/2011,11/30/2011 and 12/21/2011.
- todo list
1. Field survey: field strengh, gradient
2. RTD calibration (one in oven)
3. Fixed the pickup coil in oven.
4. Seal oven with RTV
5. optical system Laser power measurement Laser spectrum measurement/Absorption adjustment Calibrations of optics orientations, e.g. λ/4 plates Laser polarization measurement Optics alignment [1]
6. testing follow [Cell_testing_method]