G2p Safety Readiness Review
From Hall A Wiki
Overview
On January 17, JLab will review the readiness of E08-027/007 to safely begin production data taking. This wikipage is the central repository of all collaboration information relevant to this review. The official charge is here. In addition, the committee has also asked us to address these specific questions.
Review Agenda
January 17, 2012; JLab F113, 1:00-5:00 pm
Topic | Presenter |
---|---|
Introduction/Overview (draft) | J. P. Chen |
Polarized Target update | C. Keith |
g2p/GEp Beamline (draft) | T. Michalski |
Beamline (draft) runorbits | Y. Roblin |
Engineering, Design & Field Mapping (draft) | R. Wines |
Hall A Installation, Mechanical Structures (draft) | E. Folts |
Radiation Control | P. Degtiarenko |
Radiation Damage (draft) | G. Kharashvili |
Experiment Preparation (draft) | K. Slifer |
Individual documents are posted here (last update 01/11)
Alternatively, all this material can be downloaded as a single archive (last update 01/11)
Notes
- Overview of JLab's Operational Safety Procedure Program.
- JLab OSP template.
- List of previous JLab OSPs.
- JLab Docushare