To do list
From Hall A Wiki
Revision as of 18:39, 6 February 2007 by 129.57.164.43 (Talk)
To do list for LEDEX B/Li run February 6th 2007
- BCM calibration
- IL02
- beam calorimeter
- BPM calibration , bull eyes scan
- Scaler
- Dead-time
- Detector efficiency
- EPICS variable (done)
- Start/End of run (done)
- Detectors
- Detector checkout
- Trigger scintillator balancing ( especially S1 right )
- VDC efficiency ( fixed and recovering )
- S1 Left paddle right (fixed)
- Left gas cerenkov ( ok threshold to low during first run )
- check EDTM
- Analysis script
- online detector check ( done )
- physics macro
- dp spectrum
- beam position raster correction